Similar Projects
North West Interceptor Splitter Box Construction and Slip Lining - City of Beloit
Renovation, Infrastructure
Conception
$250,000 CJ est. value
Beloit, WI 53511

North West Interceptor Splitter Box Construction and Slip Lining - City of Beloit
Renovation, Infrastructure
Conception
$250,000 CJ est. value
Beloit, WI 53511

Illinois State Line - Madison Incident Management
Infrastructure
Design
$4,000,000 CJ est. value
Janesville, WI 53546

Bergen - Emerald Grove RR OPS/ Crossing Repair/ Resurface
Infrastructure
Design
$250,000 CJ est. value
Clinton, WI 53525

Traxler Parking Lot Improvements
Infrastructure
Post-Bid
Janesville, WI

Sidewalk Maintenance
Infrastructure
Post-Bid
Beloit, WI

Curb and Gutter and Sidewalk Replacement
Infrastructure
Results
Janesville, WI

Water and Sewer System Improvements I
Infrastructure
Results
Janesville, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Arthur Drive Mini Warehouse
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Milton, WI 53563

Edgerton Apartments
New Construction, Infrastructure
Pending Verification
$16,000,000 CJ est. value
Edgerton, WI 53534

Hart Road Storm Water Pond - City of Beloit
Infrastructure
Conception
$400,000 CJ est. value
Beloit, WI 53511

C Janesville, Center Avenue RR OPS / Crossing Surface
Infrastructure
Design
$500,000 CJ est. value
Janesville, WI 53548

2022 Parking Lot Improvements
Infrastructure
Post-Bid
$100,000 est. value
Janesville, Monroe, WI 53546

Last Updated 06/21/2023 10:18 AM
Project Title

North Street Sanitary Sewer Replacement

Physical Address View project details and contacts
City, State (County) Milton, WI 53563   (Rock County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $282,384 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed construction consists of approximately 404 LF of sanitary sewer removal and replacement, sanitary manhole replacements, concrete sidewalk ramps, concrete street patching, hot-mix asphalt patching, reinforced concrete culvert pipe replacement, and other miscellaneous items of work. Direct all questions about the meaning or intent of the Contract Documents to Engineer Gary A. Vogel (Telephone 815-444-3356 or email gvogel@baxterwoodman.com)

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents