Similar Projects
Union Market Gateway
New Construction - 52,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Washington, DC 20002

Union Market Gateway
New Construction - 52,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Washington, DC 20002

Brookland Manor
New Construction
Design
Washington, DC 20018

Bearden Arts Building
New Construction - 26,000 SF
Design
Washington, DC 20002

Park Morton Phase I - Midrise Building
New Construction
Post-Bid
Washington, DC 20010

Park Morton Phase I - Midrise Building
New Construction
Post-Bid
Washington, DC 20010

IDIQ A/E Civil Structural NAVFAC Washington
Results
$150,000 to $15,000,000 est. value

Redevelopment of Fletcher-Johnson
Results
Washington, DC 20019

Parkside - Parcel 11
New Construction
Construction
$42,400,000 est. value
Washington, DC 20019

Parkside - Parcel 11
New Construction
Construction
$42,400,000 est. value
Washington, DC 20019

Chinatown Mixed-Use
New Construction, Infrastructure - 7,174 SF
Pending Verification
$27,000,000 CJ est. value
Washington, DC 20001

Chinatown Mixed-Use
New Construction, Infrastructure - 7,174 SF
Pending Verification
$27,000,000 CJ est. value
Washington, DC 20001

All-Electric Bus Garage
New Construction
Conception
Washington, DC

Gallaudet Parcel 3
New Construction - 42,858 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Washington, DC

Terrace Manor Apartments
New Construction, Renovation
Post-Bid
Washington, DC 20020

Last Updated 04/06/2023 09:05 AM
Project Title

Hanover Reed Street PUD

Physical Address View project details and contacts
City, State (County) Washington, DC 20018   (District of Columbia County)
Category(s) Green Building, Heavy and Highway, Industrial/Manufacturing, Residential
Sub-Category(s) Apartments/Condominiums, Industrial Warehouse, LEED Certified, Parking Garage, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $275,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of approximately 723 new residential units between two phases (Phase I, Phase IIA, Phase IIB) with approximately 18,000 square feet of ground floor PDR/ maker space. On October 13, 2022, the Zoning Commission approved the Consolidated PUD/ Map Amendment. An architect has been selected. Information regarding the selection of a general contractor has not been disclosed. Although a firm timeline for construction has not been determined, Phase I construction is not anticipated to begin prior to Spring 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction. 18,000 SF. Parking Spaces, 368 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Coiling Doors and Grilles, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents