Similar Projects
Lighting Improvements in 9 City Owned Garages
Renovation
Design
$100,000 CJ est. value
Pasadena, CA 91101

Replacement of 4160V Switchboard 1L at the Joint Water Pollution Control Plant
Renovation
Sub-Bidding
$400,000 CJ est. value
Carson, CA 90745

Monument Sign
Term Contract
Sub-Bidding
Alhambra, CA 91801

Conduit Infrastructure For Wi-Fi Expansion
Infrastructure
Post-Bid
Los Angeles, CA 90081

2001 North Garey Avenue Power Upgrade
Infrastructure
Post-Bid
Walnut, CA 91789

New 400-Amp Panel for Future Electric Vehicle Charging Stations, and Concrete Pad for Edison's Surface Mounted Transformer & Required Conduits
Alteration
Results
Torrance, CA 90504

Low Voltage and Network Cabling
Alteration
Results
Torrance, CA 90503

Portable Generator
Term Contract
Sub-Bidding
Manhattan Beach, CA 90266

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

LAUS Wires And Cables
Alteration
Results
Less than $1,300,000 est. value
Los Angeles, CA 90081

Analyzer, CT and Tester, Votano Voltage Transformer
Term Contract
Sub-Bidding
Los Angeles, CA 90012

Electric Service Upgrade at Five School Sites
Renovation, Infrastructure
Post-Bid
Whittier, CA 90603

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Building X - 5KV Switch Replacement Project
Renovation
Sub-Bidding
$175,000 CJ est. value
Long Beach, CA 90810

Led Lighting Retrofit
Alteration
Post-Bid
Los Angeles, CA 90007

Last Updated 09/03/2022 03:32 AM
Project Title

Underground Transformers

Physical Address View project details and contacts
City, State (County) Pasadena, CA 91101   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Underground Transformers Online Q&A No Pre-Bid Meeting No Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% The initial term of the contract resulting from these Specifications shall be for four years from the date of execution by the City. The contract may be extended for two optional one-year extension periods subject to the approval of the City Manager.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents