Similar Projects
Reported | 09/10/2021 12:04 PM |
Project Title | Thermal Utility System Improvements |
Physical Address | View project details and contacts |
City, State (County) | Gainesville, FL 32611 (Alachua County) |
Category(s) | Sewer and Water, Single Trades |
Sub-Category(s) | Electric, Sanitary Sewers |
Contracting Method | |
Project Status | Construction Commenced April 2021 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Thermal Utility System Improvements project is one of several concurrent activities within the Gainesville campus and requires close coordination among the adjacent construction boundaries. The following is a summary of the UF-623B Scope of Work: • All labor, material, supervision, management, and necessary auxiliaries to construct new underground Thermal Distribution utility infrastructure. • Approximately 4,600 trench-feet of large diameter chilled water pipe and 8,500 trench- feet of steam and condensate return pipe of various sizes. • Approximately 2,000 feet of electrical concrete encased ductbank • Construction of new and refurbished manholes • Relocation of existing utilities impacted by the new thermal infrastructure Utility improvements will be constructed through major campus vehicular and pedestrian thoroughfares, namely Museum Road and Newell Drive |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |