Similar Projects
Last Updated | 05/09/2023 12:01 PM |
Project Title | Kirkwood Elementary School |
Physical Address | View project details and contacts |
City, State (County) | Clarksville, TN 37043 (Montgomery County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Elementary School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of the construction of a new elementary school facility of approximately 120,408 gross square feet area on a previously developed campus and pad ready site. Sitework will include connection of utilities and new concrete sidewalks. The exterior wall structure of building wings A,B,C and D consists of ICF insulated concrete bearing walls with face brick and E.I.F.S. on the exterior. The 12 classroom E wing consists of brick veneer on exterior CMU backup walls. The roof includes standing seam metal panels on rigid insulation on metal deck and steel bar joists or light gage steel trusses and some roof areas will be low sloped single ply membrane on tapered rigid insulation on metal deck and steel bar joists. The floor structure is concrete slab on grade. The compacted building pad is already in place. Building wings A,B,C and D HVAC system shall utilize a water source heat pump system with a cooling tower and boiler. The 12 classroom E wing consists of Multi-zone Variable Refrigerant Flow (VRF) units for cooling and heating and a dedicated outside air unit for ventilation. The Owner reserves the right to waive any informalities or to reject any or all bids. Last day for Questions: Wednesday, April 19, 2023 his project consists of the construction of a new elementary school facility of approximately 120,408 gross square feet area on a previously developed campus and pad ready site. Achieve Substantial Completion of Phase 1 on or before May 31, 2024. Achieve Substantial Completion of Phase 2 on or before June 30, 2024. Final Completion shall be achieved within 30 days of Substantial Completion |
||||||||||||||||||||||||||||||||||||||||
Details | 120,408 SF.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |