Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Zone 3 West Transmission Main
Term Contract, Alteration
Bidding
Kennewick, WA

Albion Drive Roundabout Improvements
Demolition, Alteration
Bidding
WA

Louis Thompson Tightline
New Construction, Infrastructure
Post-Bid
$5,800,000 est. value
Sammamish, WA 98074

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA

Central Avenue ,Main Street Resurfacing and Deerpath ,Kay Water Main Improvements
Infrastructure
Bidding
$600,000 to $700,000 est. value
Oroville, WA

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

Well Rehabilitation and Water System Improvements Project - 2022
Infrastructure
Bidding
$350,000 to $400,000 est. value
Kahlotus, WA

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Tolt Pipeline No 1 Rehabilitation
Infrastructure
Post-Bid
$3,100,000 est. value
Duvall, WA 98019

Last Updated 12/20/2021 01:01 AM
Project Title

Water Main Improvements

Physical Address View project details and contacts
City, State (County) Yelm, WA   (Thurston County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,740,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Contract provides for water main improvements within the City of Yelm (Schedule A) and Thurston County (Schedule B). Work will consist of furnishing and installing approximately 1,450 linear feet of 12-inch-diameter, 5,460 linear feet of 10-inch-diameter, 65 linear feet of 8-inch-diameter, and 140 linear feet of 6-inch-diameter PVC water main, 75 linear feet of 12-inch-diameter DI water main and pipe support on bridge, ten fire hydrants, valves, appurtenances, replacement and reconnection of 27 water services, connections to the existing water main, traffic control and restoration. The Contractor shall provide and install all water system materials including water main, fittings, valves, fire hydrants, and water service materials.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents