Similar Projects
LC 309 311 Remodel
Bidding
$140,000 est. value
Orem, UT 84058

Capitol Aerial Suspension System - Phase I and II
Bidding
Salt Lake City, UT 84111

SLCC Interior Sign Replacement
Post-Bid
Less than $69,000 est. value
Salt Lake City, UT

Crossville Studios Tile or Equal
Post-Bid
Clearfield, UT 84016

Room Partition Walls
Term Contract
Results
Less than $50,000 est. value
Salt Lake City, UT 84112

U Hospital Interior Signage - Phase 2
Results
Less than $1,200,000 est. value
Salt Lake City, UT

Davis School District High School Stage Rigging Systems Replacement
Construction
Layton, UT 84041

Design, Construct and Install A Bouldering Wall and the Surrounding Padded Flooring
Post-Bid
Orem, UT

Locker Replacement for Centerville and Mueller Park Jr. High Schools
Results
Bountiful, Centerville, UT 84010

Lozer Style Shelving DABC Installation and Contracting
Post-Bid
UT

DFCM Construction - Pre Qualified General - Utah Fine Arts Council Remodel - 20251080
Results
Less than $129,140 est. value
Salt Lake City, UT 84102

Capitol Aerial Suspension System - Phase I
Post-Bid
Salt Lake City, UT 84103

Fort Herriman Ceiling Addition
Results
Herriman, UT 84096

U Hospital Mediserve Renovo Dock Remodel - Metal Stud Framing
Post-Bid
$1 to $737,500 est. value
Salt Lake City, UT 84113

Secure Entries Remodel - CHHS and HHS
Results
West Jordan, UT 84081

Last Updated 12/09/2019 09:04 PM
Project Title

High School Stage Rigging Systems Replacement

Physical Address View project details and contacts
City, State (County) Clearfield, UT 84016   (Davis County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The District hired an independent consultant to evaluate all the high school stage rigging systems in the District. This report identified several areas where the support was inadequate. The District then contracted with a structural engineer to evaluate the existing support structure. The scope of the repairs that are needed are as follows: • Layton High School o Narrow the existing proscenium opening to 50 feet o Replace the existing rigging system o Install a loading platform for the rigging system o Replace or strengthen the existing head block beam o Install ‘X’ bracing between existing roof joists o Replace existing catwalks and railings o Strengthen existing roof diaphragm at stage • Viewmont High School o Narrow the existing proscenium opening to 50 feet o Replace the existing rigging system o Install a loading platform for the rigging system o Replace or strengthen the existing head block beam o Install ‘X’ bracing between existing roof joists o Replace existing catwalks and railings o Strengthen existing roof diaphragm at stage o Upgrade access ladders as needed • Woods Cross High School o Narrow the existing proscenium opening to 50 feet o Strengthen existing loading platform o Provide additional access ladders or stairs as required

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents