Similar Projects
Reported | 03/10/2021 12:00 AM |
Project Title | Reconstruction/Rehabilitation- Orangeburg Co |
Physical Address | View project details and contacts |
City, State (County) | SC (Orangeburg County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Construction Stakes, Lines & Grades 3.000 Ea Traffic Control 1.000 Ls Railroad Insurance And Flagging 001 1.000 Ls Removal & Disposal Of Existing Pavement 660.000 Sy Unclassified Excavation 1,460.000 Cy Borrow Excavation 5,864.000 Cy Excavation For Shoulder Paving 255.552 Sta Hauling Of Excavated Shoulder Material 255.552 Sta Cement Modified Recycled Base (10" Unif)-Curing Method B 109,600.000 Sy Cement Modified Recycled Base (12" Unif)-Curing Method B 130,121.602 Sy Portland Cement For Cement Modified Recycled Base Course 8,400.000 Ton Maintenance Stone 44.650 Ton Hma Shoulder Widening Course 1,545.280 Ton Liquid Asphalt Binder Pg64-22 3,091.964 Ton Full Depth Asph. Pav. Patching 6" Unif. 2,345.000 Sy Full Depth Asph. Pav. Patching 8" Unif 2,130.000 Sy Milling Existing Asphalt Pavement 1.5" 1,584.000 Sy Milling Existing Asphalt Pavement 1.75" 24,230.000 Sy Milling Existing Asphalt Pavement 2.0" 179,480.000 Sy Milling Existing Asphalt Pavement (Variable) 39,900.000 Sy Milled-In Rumble Strip 31.400 Mi Hot Mix Asphalt Intermediate Course Type B 1,010.840 Ton Hot Mix Asphalt Surface Course Type B 27,840.348 Ton Hot Mix Asphalt Surface Course Type C 8,042.418 Ton Hot Mix Asphalt Surface Course Type D 12,833.186 Ton Driveway Paving-Surface Type D 3,120.000 Ton Full Depth Concrete Pavement Patch - 8" 160.000 Sy Permanent Construction Signs (Ground Mounted) 6,348.000 Sf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 3,496.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 196,696.000 Lf 8" White Solid Lines Perm.Pvmt.Markings 1,762.000 Lf 12in X 18in White Triang. Yield Bar (Gaps Exc)Perm.Pvmt.Mark 40.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 3,024.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 19.000 Ea White Word Message "Only" -Perm.Pvmt.Marking 11.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Perm.Pvmt.Marking 2.000 Ea Railroad Crossing Symbols - Perm.Pvmt.Marking 1.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 21,450.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 136,316.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 7,246.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 541,042.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 7,850.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 3,884.000 Lf 12" White Solid Lines - Fast Dry Paint 600.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 6,310.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 29.000 Ea White Word Message "Only"-Fast Dry Paint 11.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 2.000 Ea Railroad Crossing Symbols - Fast Dry Paint 3.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 58,800.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 327,922.000 Lf 6"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 7,300.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 2,400.000 Lf 4" White Broken Lines -(Gaps Excluded) - Epoxy Paint 50.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Epoxy Paint 190.000 Lf 8"White Solid Lines-Crosswalk&Channelization-Epoxy Paint 180.000 Lf 24"White Solid Lines(Stop Lines/Diag.Lines) Epoxy Paint 50.000 Lf White Single Arrows (Left, Straight, Right) Epoxy Paint 2.000 Ea 4"Yellow Solid Lines-Pvt.Edge&No Passing Zone - Epoxy Paint 420.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 6,320.000 Lf 12" White Solid Lines - Thermo. - 125 Mil. 300.000 Lf 12in X 18in White Triang. Yield Bar (Gaps Exc)Thermo-125mil 80.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 45.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 8.000 Ea 6" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 6,040.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"X4" 210.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"X4" 2,422.000 Ea Perm.Red/Clear Pavement Markers Bi-Dir. - 4"X 4" 14.000 Ea Removal Of Pavement Markings 890.000 Lf Removal Of Pavement Markings 2.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 990.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 11,060.000 Lf Sawcut For Loop Detector 3,590.000 Lf Adjust Drop Inlet Adjust D. I. 14.000 Ea Concrete Sidewalk(4" Uniform) 60.000 Sy Detectable Warning Material 430.000 Sf Pedestrian Ramp Construction 600.000 Sy Surface Applied Detectable Warning 280.000 Sf Remove & Dispose Semi-Rigid Gr Device 15.000 Lf Premash Thrie With Base Pl 6.25 Space 516.000 Lf Premash W-Beam Compressed Shldr 9' Post 5,525.000 Lf Premash Thrie Strong Post Guardrail 230.000 Lf Premash Thriebeam Bridge Conn Tbbc3 4.000 Ea Premash W-Beam W Base Pl 6.25 Spa 100.000 Lf Premash Type T Tl3 Leading 50' 22.000 Ea Permanent Grassing For Non-Permitted Resurfacing Projects 28.346 Acre |
||||||
Details | Paving/Reconstruction, Addition.
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |