Similar Projects
College Avenue Sinkhole and Retaining Wall Repair
Infrastructure
Bidding
Oakmont, PA 15139

Drain Repairs
Infrastructure
Bidding
Pittsburgh, PA 15222

Lateral Support of McCoy Road Northwest of Dunn Street Mccoy Road Stowe Township
Post-Bid
Pittsburgh, PA 15136

2020 Paving Project
Post-Bid
Pittsburgh, PA 15123

2020 Road Program
Results
Crafton, PA 15205

2020 Road Improvement Project
Results
Sewickley, PA 15143

Plum Street Improvements Phase 7
Infrastructure
Bidding
$50,000 est. value

2020 Roup Avenue Paving Program
Post-Bid
Brackenridge, PA 15014

2020 Road Maintenance - Seal Coating
Results
Moon, PA 15108

2020 Borough Wide Street and Alley Restoration Program
Post-Bid
Brackenridge, PA 15014

2020 Roadway Improvement Program
Results
Less than $112,756 est. value
Moon, PA

Bairdford Park Master Plan Construction B-1 Ballfield Project
Post-Bid
$85,000 est. value
Cheswick, PA 15024

Herron Road Remediation
Results
Allison Park, PA 15101

Combined Sewer Overflow Debris Control
Post-Bid
$30,000 est. value
Etna, PA 15223

2020 Roadway Improvement Program
Results
Pittsburgh, PA 15123

Reported 10/15/2021 12:00 AM
Project Title

Montour Trail 34C

Physical Address View project details and contacts
City, State (County) South Park Township, PA   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the extension of an existing asphalt and aggregate trail including, but not limited to, site clearing and removals; unclassified bulk excavation and fine grading; installation, maintenance and removal of erosion and sediment controls; purchase and placement of bituminous and aggregate material for trail construction; installation of chain link fence; installation of removable bollards; traffic control; utility coordination; seeding and mulching and all additional required site restoration, complete in place.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents