Similar Projects
Chequamegon-Nicolet National Forest - Bass Lake Recreation Area Well Replacement
Design
Rhinelander, WI 54501

Waukesha Water Utility Booster Pumping Station Contract 3 And 3A
Term Contract
Bidding
Waukesha, WI

Vertical Gas Collection Wells
Bidding
Appleton, WI 54911

Sump System Installation
Post-Bid
Two Rivers, WI 54241

2020 Waste Activated Sludge Pump
Post-Bid
Madison, WI 53713

Rehabilitation of Wells 15 and 17 at City Well Field
Results
Eau Claire, WI 54701

2020 Rotary Lobe Pumping Unit Purchases
Results
Madison, WI 53713

Polymer Pump Nos. 4, 5 and 6 Replacement
Post-Bid
Oak Creek, WI 53154

Municipal Well 4 – Well Construction
Results
Wausaukee, WI 54177

Well No.3 Manganese Removal
Post-Bid
Grantsburg, WI

2020 Bypass Pump Rehabilitation
Results
Milwaukee, WI

2021 Grinder, Pump Stations 17
Post-Bid
Madison, WI

Sun Prairie Utilities Test Well for Well 10
Results
Sun Prairie, WI

Well Station No. 5 HMO Treatment Facility & Building Modifications
Post-Bid
$2,907,000 est. value
Pewaukee, WI 53072

Pump House No.10 Improvements
Results
Muskego, WI

Reported 01/22/2021 12:00 AM
Project Title

Well 18 Treatment

Physical Address View project details and contacts
City, State (County) Madison, WI 53713   (Dane County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $160,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The scope of work for rehabilitation of the well generally consists of the following tasks: 1. Madison Water Utility (MWU) will perform the initial pump test 2. MWU will pull and inspect the existing well pumping equipment 3. televising the well 4. mechanical treatment of the well 5. acid treatment of the cased and upper borehole region of the well 6. chemical treatment of the entire well 7. MWU will re-install the well pump 8. MWU will perform a post-treatment pump test 9. MWU will disinfect and test the well to put it back in service.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.