Similar Projects
Last Updated | 07/12/2023 10:54 AM |
Project Title | 2023 Street Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Pryor, OK 74361 (Mayes County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $300,493 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract 1 - Mill and Overlay Asphalt and/or Concrete Major Alleys Within the Commercial District and Residential Streets Each sealed envelope containing a BID must be plainly marked on the outside as: BID for 2023 ALLEY AND STREET REHABILITATION CONTRACT I and the envelope should bear on the outside the BIDDER'S name, address, and license number, if applicable, and the name of the project for which the BID is submitted. If forwarded by USPS mail, the sealed envelope containing the BID must be enclosed in another envelope addressed to the OWNER at 12 North Rowe Street, Pryor Creek. OK 74362. Each bid must be accompanied by a bid bond payable to the OWNER for five percent of the total amount of the bid. A certified check may be used in lieu of the bid bond. No bid security is required if bid is $7,500.00 or less. As soon as the bid prices have been compared, the OWNER will return the bonds of all except the three lowest responsible bidders. The bid bond of the successful bidder will be retained until the Performance Bond, Statutory Bond, Maintenance Bond and Certificate of Insurance have been executed and approved, after which it will be returned. The bid security of the two remaining unsuccessful Bidders will be returned after the successful Bidder has entered into a contract and has furnished the required bonds and insurance. A Performance Bond, Statutory Bond and Maintenance Bond each in the amount of 100 percent of the Contract Price with a corporate surety approved by the OWNER will be required for the faithful performance of the Contract. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |