Similar Projects
SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Exchange Image Upgrade
Post-Bid
$5,000,000 to $10,000,000 est. value
Fort Rucker, AL

D/B Southeast MATOC - Phase 2
Post-Bid
$1,000,000 to $170,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

Region 4 Single Award IDIQ Job Order Construction Contracts (JOCC) for Construction Services In States of AL, FL, GA, KY, MS, NC, SC, & TN
New Construction, Renovation
Design
$2,000 to $5,000,000 est. value

USPFO-AL Construction Multiple Award Task Order Contract (MATOC)
Post-Bid
$2,000 to $6,000,000 est. value

Access Control Point Program Design Build II -- RFI(2)
Results

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Results
$250,000 to $5,000,000 est. value

IDIQ Multiple Award Task Order Contracts for Horizontal Construction, Renovation, Repair, and Incidental Design In Alabama, Florida, Mississippi, and Georgia
New Construction, Renovation
Post-Bid
$100,000 to $250,000 est. value

Addition to South Dale Middle School
Addition
Results
Pinckard, AL 36371

Secure Construction SATOC
Post-Bid
$100,000,000 est. value
Washington, DC

Classroom Improvements at Daleville Middle School (Proposal C)
Renovation
Results
Daleville, AL

Last Updated 12/06/2021 11:10 AM
Project Title

Aircraft Maintenance and Welding Shop

Physical Address View project details and contacts
City, State (County) Ozark, AL   (Dale County)
Category(s) Education, Government/Public
Sub-Category(s) Elementary School, Middle/Senior High School, Misc. Buildings
Contracting Method
Project Status Permitting, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $1,620,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Elementary School, New Construction, Middle/Senior High School, New Construction.
Division 02 - Existing Conditions.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents