Similar Projects
Burdette Park Lift Station Rehabilitation Project
Renovation
Bidding
$547,800 est. value
Evansville, IN

New Main Lift Station and Unsewered Areas Project
New Construction
Bidding
Rensselaer, IN

Water Utility Improvements, Division "C" - Phase 3
Post-Bid
Crown Point, IN 46307

Lake Station Crossroads Lift Station Replacement, Lake Station, Lake County, Indiana (Usace Acquisition)
Post-Bid
$1,000,000 to $5,000,000 est. value
Lake Station, IN

Hague Road and Allisonville Road Lift Stations Improvements
Results
$2,000,000 est. value
Fishers, IN 46038

ARV & Pump Station & Force Main Replacement
Results
Clarksville, IN 47129

Perry Crossing Lift Station Rehabilitation
Post-Bid
Sellersburg, IN

Daylight South Lift Station Rehab
Results
Evansville, IN 47708

Truesdell Lift Station and Sewer Extension
Post-Bid
La Porte, IN 46350

Lakeside Sewer Relocation
Results
La Porte, IN 46350

Cane Run Flood Control Pumping Station 5
Post-Bid
$5,000,000 to $6,000,000 est. value
Jeffersonville, IN

Perry Lakes Lift Station Improvements
Results
Fort Wayne, IN 46802

Wastewater Treatment Plant And Lift Station Upgrade
Post-Bid
Rochester, IN

Heaton Lake Lift Station Upgrades
Results
Goshen, IN 46526

Market Survey/Sources Sought for Construction Work at Gary Sanitary District - 27th and Chase Pump Station Force Main Replacement, In Lake County, Gary, Indiana
Post-Bid
Gary, IN

Last Updated 09/24/2021 03:10 PM
Project Title

River Bend Bluffs Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN   (Allen County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a Lift Station Bypass Pumping Connection, modifications to an existing Valve Vault and replacement of all valves, Bypass Pumping, replacement of all Wet Well mechanical and electrical equipment and telemetry

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents