Similar Projects
Bridge Creek Residential Development / Prattville
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Prattville, AL 36067

The Gables On Lawrence
New Construction, Infrastructure
Conception
$51,000,000 CJ est. value
Fairhope, AL 36532

Skyline Village Townhomes
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fairhope, AL 36532

Orange Beach Medical Plaza
New Construction, Infrastructure - 11,000 SF
Design
$6,400,000 CJ est. value
Orange Beach, AL 36561

Prattville 6th Street Improvements
Infrastructure
Bidding
$2,200,000 CJ est. value
Prattville, AL 36067

Prattville 6th Street Improvements
Infrastructure
Bidding
$2,200,000 CJ est. value
Prattville, AL 36067

Effluent Outfall Upgrades USDA Rural Development
Post-Bid
Loxley, AL 36551

Country Club Drive Water Main Replacement Phase A- Wedgewood Drive to Fairway
Infrastructure
Post-Bid
$300,000 CJ est. value
Daphne, AL 36526

Construction of Raw Water Main for Diamante Well
Infrastructure
Results
$277,790 est. value
Daphne, AL

Canal Road Widening Water Main Relocation (Phase 2)
Infrastructure
Results
Orange Beach, AL 36561

Beef O' Bradys / Spanish Fort
New Construction, Infrastructure - 6,000 SF
Construction
$2,000,000 CJ est. value
Spanish Fort, AL 36527

Aldi / Daphne
New Construction, Infrastructure
Pending Verification
$3,500,000 CJ est. value
Daphne, AL 36526

Palmetto Ridge Townhouses
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Gulf Shores, AL 36542

Waterway Village Pedestrian Bridge - City of Gulf Shore
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Gulf Shores, AL 36542

The Noble at Daphne
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Daphne, AL 36526

Last Updated 04/13/2023 11:31 PM
Project Title

Water System Improvement Project - Contract 1 and 2

Physical Address View project details and contacts
City, State (County) Eufaula, AL 36027   (Barbour County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,591,929 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of installing approximately 685 radio read meters and necessary appurtenances and installing 22,700 L.F. of 6" PVC water mains and necessary appurtenances. The owner reserves the right to waive any informalities and reject any or all bids. Bid security shall be furnished in accordance with the Instruction to Bidders. Separate Bids will be received for the following Contracts: Contract No. 1-Water Meter Replacement, Estimate=$310,000, Contract time=90 days Contract No. 2-Water Main Replacement, Estimate=$1,030,000, Contract time=120 days Bid Result Contract No. 1 - Central Plant Technology, Inc. - $299,200.00 Contract No. 2 - Blankenship Contracting,Inc - $1,292,728.96

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents