Similar Projects
54 Scott BOOST Construction Requirements
Infrastructure
Bidding
Houston, TX 77282

Construction of Pedestrian Trails Along Harris County Drainage Ditch D100-00-00 Brays Bayou Under Addicks Clodine Road Bridge for Precinct 3
Infrastructure
Bidding
TX

Woodforest 2021 Trails
Post-Bid
Sugar Land, TX 77478

Tirz 25 Sidewalk, Curbs, and Curb Ramps Project - Along Various Major Thoroughfares
Post-Bid
Houston, TX 77002

Intramural Gravel Lot Conversion
Results
Houston, TX 77204

Public Safety Complex - Parking Lot Improvements
Results
$190,000 to $250,000 est. value
Nederland, TX 77627

FM 3481 Sidewalk Improvements (Prospector to Vineyard)
Infrastructure
Bidding
$492,500 est. value
Harker Heights, TX 76548

Canopy Additions/Concrete Parking Lot
Post-Bid
Hemphill, TX

2017 Bond Program - Pedestrian Mobility and Streets Task Order Contract Package 8
Results
Less than $4,000,000 est. value
San Antonio, TX 78205

Burnet Road Corridor - Koenig Lane Intersection to White Horse Trail
New Construction, Infrastructure
Bidding
$1,450,000 est. value
Austin, TX 78799

Lighting and Paving Improvements to Victor Trevino Sports Complex
Post-Bid
Pearsall, TX 78061

Sweetwater Parking Lot Replacement
Results
Less than $84,163 est. value
Sweetwater, TX 79556

Meridiana - Section 48
Infrastructure
Bidding
TX

Annual Contract to Install Sidewalks
Term Contract
Post-Bid
Port Arthur, TX

Main Street Brick Sidewalk Improvement
Results
Liberty, TX 77575

Reported 01/12/2022 12:00 AM
Project Title

Schlather Trail Extension

Physical Address View project details and contacts
City, State (County) Cibolo, TX   (Guadalupe County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. The extension of the Schlather Trail includes the grading and paving of a concrete trail to connect two existing portions of trail, installation of a canopied picnic area along the trail, placement of limestone block for seating along the trail and construction of a boardwalk to avoid disturbance of the existing Bald Cypress root system. 2. This project does not include hazardous environmental work.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents