Similar Projects
Exposed Sewer Pipe Repairs - Site 5
Infrastructure
Results
$3,200,000 to $3,700,000 est. value
Bothell, WA 98011

Friday Harbor Labs Sewer Repair
Renovation, Alteration
Post-Bid
$160,000 to $200,000 est. value
Friday Harbor, WA 98250

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

Stromwater Operations and Maintenance
Alteration
Bidding
Port Orchard, WA 98366

Environmental Consulting Services for 2021 Stormwater Code Amendments
Renovation, Alteration
Bidding
$75,000 est. value
Sammamish, WA 98075

Cathodic Protection Installation
Infrastructure
Post-Bid
$175,000 est. value
Tacoma, WA

Port Gardner Storage Facility
New Construction, Infrastructure
Post-Bid
Everett, WA 98213

Louis Thompson Tightline
New Construction, Infrastructure
Bidding
$5,800,000 est. value
Sammamish, WA 98074

Stormwater Management Plan
Alteration
Bidding
WA

Ostrich Bay Creek Stormwater Treatment
Infrastructure, Alteration
Results
$1,000,000 to $1,300,000 est. value
Bremerton, WA

Engineering Services for Parking Lot And Trailhead Development & Stormwater Management Plan
New Construction, Infrastructure
Results
Blaine, WA 98230

E 5th Street & NPS Parking Improvements
Infrastructure
Bidding
Vancouver, WA 98687

Last Updated 10/07/2021 10:35 AM
Project Title

Sewer Outfall Replacement

Physical Address View project details and contacts
City, State (County) Friday Harbor, WA 98250   (San Juan County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,500,000 to $2,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of furnishing all labor, equipment and materials necessary for installing new 18-inch diameter HDPE pipe via directional drilling and placement on sea bed, connecting upland end to existing sewer outfall piping, and related work. Note that the existing outfall can be taken off-line for a maximum period of Eight (8) consecutive hours. Work will be in or adjacent to a marine environment.

Details

Division 02 - Existing Conditions.
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents