Similar Projects
Asphalt Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Concrete Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Northwest Hangar Taxilane Construction at Friday Harbor Airport
Infrastructure
Bidding
$1,500,000 CJ est. value
Friday Harbor, WA 98250

3rd Street Improvements
Infrastructure
Bidding
$2,800,000 CJ est. value
Dayton, WA 99328

Trees and Concrete Upgrade
Alteration
Post-Bid
$285,000 est. value
Clarkston, WA

Russell Creek Project
Alteration
Post-Bid
WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

3rd Street SW And Lea Hill Bridge Deck Preservation
Renovation, Infrastructure, Alteration
Results
$700,000 to $900,000 est. value
Auburn, WA 98092

Rebid Green Lake Community Boathouse
Demolition, Renovation, Infrastructure
Construction
$8,367,000 CJ est. value
Seattle, WA 98103

DR0515 Repair Fairway 15
Term Contract
Design
$5,000,000 est. value
WA

Wine Country Road Roundabout and Utility Improvements
Infrastructure
Bidding
$1,500,000 CJ est. value
Yakima, WA 98901

Main Canal Polyurea
Alteration
Post-Bid
Ephrata, WA 98823

Concrete Pavement Repair Project
Infrastructure
Results
Washougal, WA 98671

Gustaves Manor Envelope Upgrade
Renovation
Design
$3,446,000 CJ est. value
Auburn, WA 98002

West Canal Polyurea
Alteration
Post-Bid
Quincy, WA 98848

Last Updated 03/25/2023 11:34 AM
Project Title

Beacon Demolition/Installation

Physical Address View project details and contacts
City, State (County) Colfax, WA 99111   (Whitman County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $179,382 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work being considered is: 1. Demolition of existing Airport Beacon; 2. Installation of new Airport Beacon on a new tower/tip-down pole; and 3. Electrical trenching from existing Electrical Vault to new Airport Beacon. This contract will be funded, in part, by a grant from the Federal Aviation Administration. As such, it will be subject to federal requirements. These include, but are not limited to: 9) Buy American Preference 10) Civil Rights-Title VI Assurances 11) Davis Bacon Requirements 12) Debarment and Suspension 13) Disadvantaged Business Enterprise (DBE) 14) Federal Trade Restrictions 15) Lobbying Federal Employees 16) Recovered Materials The estimated construction cost is from $175,000 to $225,000 Est. Completion Date: Aug. 30, 2024 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Notice to Proceed for Phase 1 is anticipated in August or September 2023, at the convenience of the Owner. Notice to Proceed for Phase 2 is anticipated in Summer 2024, at the convenience of the Owner A 15 calendar day period is allowed over two phases for all contractor work associated with the project. Work in Phase 1 shall be completed in 10 continuous calendar days. Work in Phase 2 shall be completed in 5 continuous calendar days. Contract time will be paused between the completion of Phase 1 work to the start of Phase 2 work.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents