Similar Projects
Fickel Park Restroom
New Construction
Bidding
$115,000 est. value
Berthoud, CO 80513

Heritage Park Restroom Renovation and Cleo Mudrock Dugout Roofing
Renovation
Post-Bid
Louisville, CO 80027

Target #T1776 Restroom Remodel
Renovation
Post-Bid
Littleton, CO 80123

Carson Nature Center Restroom Renovation
Results
Centennial, CO

Walter Byron Restroom & Playground Project
New Construction - 5,000 SF
Results
Frisco, CO 80443

Heritage Park Restroom Renovation/Cleo Mudrock Baseball Dugout Roofing Project
Renovation
Construction
Less than $125,000 est. value
Louisville, CO 80027

Parklane Pool and Bathhouse Improvements
Construction
$1,000,000 to $1,200,000 est. value
Aurora, CO 80111

Target #T1928 Restroom Remodel
Renovation
Post-Bid
Westminster, CO 80021

Double Vault Restrooms - Fisher's Peak State Park
Results
Less than $150,000 est. value
Trinidad, CO 81082

Target #T2225 Restroom Remodel
Renovation
Post-Bid
Edgewater, CO 80214

PMAA, RMSW, Swimbeach Redev and Waterline (C18SW3 & C19SW1)
Results
Delta, CO 81416

Clear Creek High School Site Improvement
Post-Bid
Evergreen, CO 80439

Highline Lake State Park-New Swim Beach Restroom
New Construction
Results
Less than $750,000 est. value
Loma, CO

Cherry Hills Farm Comfort Station
New Construction - 180 SF
Post-Bid
Cherry Hills Village, CO 80113

Affolter Park Upgrades
Results
$600,000 to $700,000 est. value
Longmont, CO 80501

Last Updated 06/02/2021 06:35 PM
Project Title

Woodbury Park Restroom Project

Physical Address View project details and contacts
City, State (County) Craig, CO 81625   (Moffat County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this Contract for generally consists of the following restroom improvements: 1. Restroom and Shelter. A new restroom and shade structure with exterior pavilion. Proposed restroom shall be a CMU structure with standing seam metal roof and will house the women's restroom, men's restroom, and mechanical room. Proposed shade structure shall be constructed of steel trusses. Both the restroom and exterior pavilion will include a concrete slab on grade and structural footings. 2. Power, water, and sewer connections. The restroom shall be complete with power, water and sewer connections. The new restroom will include a new water meter, backflow preventer, and PRV. The work includes connecting the new sanitary sewer line to the existing sanitary sewer line to the east of the proposed restroom location. 3. Associated concrete and earthwork. The work includes all associated trenching, excavation, backfill, and compaction required for the project, as well as concrete for structural slabs and foundations, complete and in place.

Details

Restroom/Bath House, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents