Similar Projects
Removal of Existing Vaulted AST Oil Storage Tank
Post-Bid
Bolton, MA

Vernon Street Gas Regulator Station Installation
Post-Bid
Less than $1,250,000 est. value
Wakefield, MA 01880

WPCF Fuel Tank and Concrete Vault Removal
Results
Less than $75,000 est. value
Turners Falls, MA 01376

Underground Storage Tank Removal & Retaining Wall Reconstruction, Jean Elder 667-3
Results
$30,350 est. value
Amherst, MA

Standby Generator Fuel Tank Replacement
Post-Bid
Less than $45,000 est. value
North Attleborough, MA 02760

Diesel Exhaust Fluid Tank
Results
Boston, MA 02129

Natural Gas Regulator Station
Post-Bid
$150,000 est. value
Wakefield, MA 01880

Removal of One 12,000 Gallon Double Walled, Fiberglass, No. 2 Fuel Oil Underground Storage Tank
Results
Less than $30,000 est. value
Agawam, MA

Gas Main Replacements
Post-Bid
Wakefield, MA

Fuel Storage Tank Maintenance Service
Results
Less than $595,900 est. value
Boston, MA 02129

Z1GC--Fuel Reconditioning
Post-Bid
Boston, MA

Fuel Tank Removal and Installation
Results
$345,500 est. value
Lunenburg, MA 01462

Maintenance and Repair of Fuel Pump Dispensers and Tank Monitoring Systems
Post-Bid
Boston, MA

Fuel Farm Improvements - Phase III - Filed Sub-Bid
Results
Less than $1,700,000 est. value
Nantucket, MA 02554

Removal and Disposal of Two 10,000-Gallon Heating Oil Tanks at Marsh Grammar School
Post-Bid
Methuen, MA 01844

Last Updated 11/17/2021 10:51 PM
Project Title

Wastewater Treatment Plant Baffle Wall Replacement

Physical Address View project details and contacts
City, State (County) Plymouth, MA 02360   (Plymouth County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

* Demolition and legal disposal of existing baffle walls in the chlorine contact tank (02 41 19, Selective Demolition). * Repair of chlorine tank concrete from demolition process (03 01 05, Concrete Repair). * Furnish and install new baffle walls into the existing chlorine contact tank (06 82 00, Fiberglass Baffle Wall).

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment, Non-pressurized Tanks and Vessels, Fiberglass Reinforced Plastic Tanks.
Division 46 - Water and Wastewater Equipment, Grit Removal and Handling Equipment, Inline Baffled Grit Removal Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents