Similar Projects
Harlem Baden Phase 3
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Saint Louis, MO 63114

Oronogo Sanitary Sewer Improvements Lift Station A and B
Renovation, Infrastructure
Bidding
$200,000 est. value
Oronogo, MO

Asphalt Sealing-HRCC 2022
Infrastructure
Bidding
Hillsboro, MO

Valve Testing and Repairs
Term Contract
Post-Bid
Columbia, MO

2021 Emergency Repairs and On-Call Sewer
Term Contract
Post-Bid
Joplin, MO

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

2021 Mill and Overlay Program
Results
Gladstone, MO

2022 - Contracted Pavement Surface Preservation
Infrastructure
Bidding
$1,641,314 est. value
Hillsboro, MO

2021 Road Improvements
Post-Bid
Indian Point, MO

Supplemental Workforce for Water Distribution System Repairs
Results
Kansas City, MO

C-2 School District Paving and Playground Project - Phase 1 and 2
New Construction, Infrastructure
Bidding
$1,350,000 est. value
Hardin, MO

Remove and Replace Damaged Sewer Line and Exterior Works
Infrastructure
Post-Bid
Kansas City, MO 64117

Asphalt Overlay Improvements
Results
University City, MO

Clayton Road Entrance Improvement
Infrastructure
Bidding
$300,000 est. value
Saint Louis, MO 63114

2021 Asphalt Pavement Improvement
Infrastructure
Post-Bid
Jackson, MO

Last Updated 04/20/2022 02:22 AM
Project Title

Poplar Bluff Industrial Park Infrastructure Improvements

Physical Address View project details and contacts
City, State (County) Poplar Bluff, MO 63901   (Butler County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of site Improvements for stormwater detention, entrance roadway, and berm along Pike Creek and also water and sewer main construction to service new manufacturing building located along Fair Street in Poplar Bluff, Missouri.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents