Similar Projects
Asphalt Pavement Improvements
Infrastructure
Post-Bid
Coventry, RI

Waterborne Traffic Paint
Infrastructure
Post-Bid
Warwick, RI

Lot E and Intersection Improvements
Results
Warwick, RI 02886

Statewide at Grade Railroad Crossing-Sinage and Striping
Results

Street Striping
Infrastructure
Post-Bid
Warwick, RI

2021-2022 Statewide Pavement Striping - East Bay - DOT
Results

Crack Seal and Micro Surfacing
Infrastructure
Post-Bid
Warwick, RI

HSIP-Statewide Roadway Departure Mitigation-DOT
Results

Athletic Field Marking Paint
Infrastructure
Post-Bid
Warwick, RI

2021 Paver Placed Elastomeric Surface Treatment C-1
Results

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Public Wayfinding Directional Signage - Exterior Signage
Term Contract
Results
Warwick, RI

Epoxy Pavement Markings
Infrastructure
Post-Bid
Coventry, RI

Road Rehabilitation Services Various Roads, Reclamation
Infrastructure
Results
$4,000,000 to $4,500,000 est. value
West Warwick, RI

Waterborne Traffic Paint
Term Contract
Post-Bid
Warwick, RI

Reported 06/25/2022 12:00 AM
Project Title

I-95 Pavement and Retaining Wall Restoration

Physical Address View project details and contacts
City, State (County) West Greenwich, RI 02817   (Kent County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rhode Island Contract No. 2022-CH-017, Federal Aid Project No. 401-422-101 is for I-95 Pavement and Retaining Wall Restoration. This work involves soil injection and pavement restoration along I-95 Northbound pavement between Laurens Street and Park Avenue to prevent future settlement, installing new barrier along I-95 NB and SB between Milford Street and Park Avenue, and removing the mechanically stabilized earth walls. Also included will be maintenance and protection of traffic, signage, striping, drainage cleaning, clearing, erosion controls, and other incidentals, complete and accepted.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 09 - Finishes, Maintenance of Finishes, Maintenance of Wall Finishes, Wall Finish Restoration.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents