Similar Projects
Domestic Water and Heating Pipe Insulation
Post-Bid
Boulder, CO 80303

Design/Build for Replacement of Computer Room Air Conditioners (CRAC)
Post-Bid
Aurora, CO 80016

Sustain Repair Air Handler Units - West Fairchild Hall
Results
$1,000,000 to $5,000,000 est. value
Black Forest, CO 80840

Repair HVAC Harmon Hall Arnold Hall
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO 80840

HVAC-CRAC ReAcq Synopsis
Post-Bid
$50,000 to $9,990,000 est. value
Colorado Springs, CO 80914

AHU Project at Denver Air Route Traffic Control Center for HVAC Contractor
Results
$200,000 to $300,000 est. value
Longmont, CO

Purchase and Delivery of Roof Top Unit (RTU) - Lyons High School
Post-Bid
Lyons, CO 80540

HVAC System - 2011-124M14, 2011-124M19 Sb267, 2015-117M19
Results
Denver, CO

Buckley AFB, CO - Comm Ducts to NOSC, B1301
Post-Bid
$1,000,000 to $5,000,000 est. value
Aurora, CO 80012

Dental School 3rd and 4th Fix Cooling Issues
Results
Less than $220,238 est. value
Aurora, CO 80045

Wilcox Building Rooftop Unit (RTU) Replacement
Post-Bid
Castle Rock, CO 80104

ECAO Comm Room A/C Systems Replacement
Results
Loveland, CO 80528

HVAC Control System Upgrade for Arvada Library
Post-Bid
Arvada, CO 80002

Plachy Hall HVAC Upgrade & Replacement
Results
Alamosa, CO 81101

HVAC Avalon Stage RTU & Ductwork
Post-Bid
Grand Junction, CO 81501

Last Updated 10/18/2021 11:37 AM
Project Title

Vestibule Heater Replacement

Physical Address View project details and contacts
City, State (County) Akron, CO 80720   (Washington County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor will remove and install new heaters and supporting equipment such as isolation valves, bleeder valves, supply lines and electrical systems supporting vestibule heaters at entrances. The heaters will be Trane Force flow heaters or equivalent. The heating system will be compatible to the current piping system in Building #1. The system is to be turn-key operational to communicate with components via hard lined.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents