Similar Projects
West Portland Pump Station Improvements
Post-Bid
Portland, TX 78374

Elmendorf Water Supply Project
Post-Bid
Elmendorf, TX 78112

Improvements to Vista Ridge Lift Station
Results
$4,831,155 est. value
Lewisville, TX 75057

Woods Lift Station Improvements
Results
$750,000 est. value
Round Rock, TX 78681

Bay Colony Lift Station Expansion Phase I
Construction
League City, TX 77573

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract A
Construction
Less than $8,102,100 est. value
McGregor, TX 76657

Wastewater Treatment Plant Rehabilitation and Lift Station Conversion
Post-Bid
$1,365,000 est. value
Katy, TX 77449

Lake Arlington Raw Water Pump Station Shared Operations Improvements
Results
$17,200,000 est. value
Arlington, TX 76013

Construction of Various Improvements at the Gibbs Sprawl and Montgomery Pump Stations
Post-Bid
San Antonio, TX 78200

Cullen Regional Lift Station Rehabilitation
Results
Less than $768,600 est. value
Pearland, TX

Lift Station 12 Rehabilitation
Post-Bid
$450,000 to $500,000 est. value
Texas City, TX 77590

Pine Lake Cove - Lift Station No. 1
Results
Conroe, TX

Lakeside Estates Lift Station Abandonment
Post-Bid
Hutto, TX 78634

Ratcliff Lake Lift Station Repairs
Results
$25,000 to $100,000 est. value
Ratcliff, TX

Booster Station Improvements and SCADA Project
Post-Bid
Hidalgo, TX 78557

Last Updated 12/16/2021 07:29 AM
Project Title

Turtle Creek No. 3 Primary Pump Station Project

Physical Address View project details and contacts
City, State (County) San Antonio, TX   (Bexar County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $30,684,046
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a 12.5-million gallon per day (MGD) firm capacity outdoor high-service pump station consisting of four (4) 4.167- MGD vertical turbine pumping units, two (2) 10-MGD well pumps and piping, piping modifications to an existing 3-MGD well, 5-MG pre-stressed concrete ground storage tank, onsite sodium hypochlorite generation (OSG) system and fluoride treatment system facilities, electrical and controls building, chemical building, fluoride building, impressed current cathodic protection system, and other miscellaneous items such as fencing, site paving, drainage improvements.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents