Similar Projects
Moreau Emergency Squad Inc. - Building Expansion
Addition
Conception
Fort Edward, NY 12828

38th Avenue Mixed-Use Development
New Construction - 42,900 SF
Design
New York, NY

Eleventh Avenue Mixed-Use (Slaughterhouse)
New Construction, Demolition, Infrastructure - 342,000 SF
Design
$300,000,000 est. value
New York, NY 10018

Malverne Police Headquarters General Construction Contract
Renovation
Bidding
$300,000 est. value
Malverne, NY 11565

Fire Station Addition and Renovations - General Construction
Renovation, Addition
Bidding
$2,800,000 est. value
Oxford, NY 13830

2020 West Danby Fire Station Renovations
Renovation
Post-Bid
Less than $175,000 est. value
Spencer, NY 14883

Various Contractor Services South Salem Fire District
Term Contract
Post-Bid
South Salem, NY

Firehouse Addition
Addition
Results
Less than $450,000 est. value
Johnsonville, NY 12094

1923 Building Renovations Flowers Park
Renovation
Results
New Rochelle, NY 10801

Cambridge Volunteer Firehouse
New Construction - 10,000 SF
Construction
$2,500,000 est. value
Cambridge, NY 12816

Construct a New Fire Station
New Construction - 3,600 SF
Construction
Stillwater, NY 12170

East Hampton Oyster Co Improvements
New Construction, Infrastructure - 6,802 SF
Pending Verification
East Hampton, NY 11937

Au Sable Forks New Fire Station
New Construction
Bidding
$100,000 est. value
Au Sable Forks, NY 12912

Repair Men`s Showers, Building 1
Renovation
Post-Bid
Rome, NY

City Hall Fire Station Renovation
Renovation
Results
Binghamton, NY 13901

Last Updated 07/08/2022 11:08 AM
Project Title

Bathrooms at Firemen`s Hall Renovation

Physical Address View project details and contacts
City, State (County) Otisville, NY 10963   (Orange County)
Category(s) Entertainment/Recreation, Government/Public
Sub-Category(s) Fire/Police Station, Restroom/Bath House
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Ladies Room: Remove wall partitions, repair drywall, relocate and install new ADA compliant entry door and handles, remove existing toilets, remove tile floor. Remove lights above sinks, install new LED lights, remove existing vanities and install ADA compliant vanities, remove mirrors and install ADA compliant mirrors, install 2 bathroom wall partitions, install commercial grade tile floor, install ADA compliant toilets, prep and paint baseboard heaters, remove ceiling tiles and replace, install baby-changing station. Mens Restroom: Remove 2 IN by 6 IN wood framed partition wall, install ADA compliant entry door and handles, remove existing toilets, remove center urinal, install ADA compliant partitions between urinals, remove tile floor, Remove lights above sinks, install new LED lights, remove existing vanities and install ADA compliant vanities, install one bathroom wall partition-with handicap accessible dimensions, install commercial grade tile floor, install new ADA compliant toilet, super flush air assist model, prep and paint baseboard heaters, remove ceiling tiles and replace, install baby-changing station. Storage Closet: Install new door at surrent opening of Ladies Room, remove bead board and sheetrock old entryway, install plywood shelving at 14 IN intervals, prep and paint closet.

Details

Restroom/Bath House, Renovation, Fire/Police Station, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Lockers.
Division 11 - Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents