Similar Projects
Replacement of Three (3) Rooftop Chillers at Main Library
Renovation
Sub-Bidding
$353,860 CJ est. value
Shreveport, LA 71101

Woodlawn HVAC Phase 1
Renovation
Sub-Bidding
$300,000 CJ est. value
Shreveport, LA 71106

HVAC Replacement at Caddo Parish Juvenile Justice Center
Alteration
Post-Bid
Shreveport, LA 71101

North Caddo Elementary Middle HVAC Upgrade
Alteration
Post-Bid
LA

HVAC and Electrical Upgrades at Caddo Parish Animal Shelter - Mosquito Control
Alteration
Results
Shreveport, LA

Sunset Acres Elementary School HVAC Upgrade
Alteration
Results
$1,000,000 est. value
Shreveport, LA 71108

HVAC Maintenance - SOS
Term Contract
Post-Bid
Shreveport, LA 71109

Green Oaks HVAC - Phase 1
Alteration
Results
$2,000,000 est. value
Shreveport, LA 71107

Oak Park HVAC, Phase 1
Renovation
Post-Bid
$966,000 CJ est. value
Shreveport, LA 71109

Southwood HVAC Phase 1
Alteration
Results
$2,000,000 est. value
Shreveport, LA 71118

Caddo Career Technology HVAC Phase 1
Renovation
Post-Bid
$388,000 CJ est. value
Shreveport, LA 71108

Fairfield HVAC Upgrade
Alteration
Results
$1,000,000 est. value
Shreveport, LA 71106

Caddo Heights HVAC Upgrade
Alteration
Results
$1,000,000 est. value
Shreveport, LA 71108

Donnie Bickham HVAC Phase I
Alteration
Results
$1,000,000 est. value
LA

Captain Shreve High School HVAC Upgrade - Phase I
Renovation
Results
$1,010,000 CJ est. value
Shreveport, LA 71105

Last Updated 11/17/2022 01:03 PM
Project Title

Donnie Bickham HVAC, Phase 2

Physical Address View project details and contacts
City, State (County) Shreveport, LA 71107   (Caddo County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Mechanical Engineer - 09/29/22
Owner View project details and contacts
Architect View project details and contacts
Description

Donnie Bickham HVAC, Phase 2. Louisiana Licensed Contractor Required for This Project With a Major Classification as Mechanical. Bid Security equal to five percent (5%) of the Total Bid shall be in the form of a bid bond, certified check or cashier's check as prescribed by LA RS 38:2218 must be attached to and made a part of the bid. If a bid bond is provided it shall be on the provided form and only on the provided form. Bid bonds must be written by a qualified company licensed to do business in Louisiana. The successful bidder will be required to furnish a Performance Bond written by a company licensed to do business in Louisiana in an amount equal to one hundred percent (100%) of the contract amount. For this project, Liquidated Damages will apply in the amount of one thousand dollars ($1,000.00) per day for each consecutive calendar day which the work is not completed, beginning with the first day beyond the established completion date of July 31, 2023. No bid may be withdrawn for a period of forty-five (45) days after actual date of the opening thereof. The Board reserves the right to reject any and all bids. The Caddo Parish School Board desires that Bidders make a good faith effort to utilize 25% small and economically disadvantaged businesses.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents