Similar Projects
HVAC and Mechanical Products
Term Contract
Bidding

HVAC and Mechanical Products
Term Contract
Bidding

West Woods Upper Elementary School Dehumidification Project
Post-Bid
Farmington, CT

HVAC Preventive Maintenance Services
Post-Bid
Hartford, CT

Sales Booth HVAC (H)
Results
Hartford, CT 06141

Replacement of the Air Handling Units at Amity Regional High School
Results
Less than $644,000 est. value
Woodbridge, CT 06525

Brien Mcmahon High School - Pipe Tunnel Ventilation and Unit Ventilator Renovations
Bidding
$75,000 est. value
Norwalk, CT 06854

Testing and Treatment of HVAC
Term Contract
Post-Bid
Bridgeport, CT 06606

Air Handling Units (AHU) - 10 Humidifier Replacement
Results
Less than $96,206 est. value
Farmington, CT

K.T. Murphy School Toilet Exhaust Project for Stamford Public Schools
Bidding
Stamford, CT 06902

Chillers Service Maintenance and Repairs
Term Contract
Post-Bid
Waterbury, CT 06706

Service to Cooling Tower, Chiller and Condenser
Results
Waterbury, CT

Heating Plant Upgrades at Rippowam Middle School
Bidding
Stamford, CT 06905

RTU Replacement to Long River Middle School
Post-Bid
Prospect, CT 06712

HVAC Replacement Library for the Blind and Physically Handicapped
Results
Less than $500,000 est. value
Rocky Hill, CT

Reported 05/14/2021 12:00 AM
Project Title

North Heat Plant High Temperature Hot Water Generators Isolation Valve Addition

Physical Address View project details and contacts
City, State (County) Willimantic, CT   (Windham County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $79,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of the new valves on the high temperature hot water piping in the heat plant. Removal of some existing valves and modifications of the existing high temperature hot water piping needed for installation of the new valves. Installation of the high efficiency butterfly valves in the existing high temperature hot water piping in the heat plant and bypass valves. Coordinating x ray testing of the weld joints with the independent company hired by ECSU. This contractor shall also provide access including staging to the overhead weld joints.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.