Similar Projects
Last Updated | 01/10/2023 10:33 AM |
Project Title | Northeast District (Ned) Phase II Wastewater Collection System Contract D: Pokagon State Park Wastewater Collection System |
Physical Address | View project details and contacts |
City, State (County) | Fremont, IN 46737 (Steuben County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Paving/Reconstruction, Sewage Treatment Plant, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $3,000,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of January 10, 2023, this project has not yet been awarded. A timeline for award has not yet been established. Alt & Witzig Project no.: 21IN0663S Pokagon State Park Wastewater Collection System o A pressure sewer system to serve Pokagon State Park, including: 1.22,000 LFT of pressure sewers and service laterals varying in size between 1-1/4" and 6" 2.21 EA grinder pump stations 3.15 EA Flushing/ARV/Hybrid Stations 4.Construction of one (1) new sanitary pump station 5.Decommissioning and demolition of existing wastewater treatment plant 6.Decommissioning of existing wastewater collection system 7.Construction of gravity sewer laterals and electrical connections to existing park facilities 8.Pavement and landscaping restoration 9.Traffic maintenance The Owner reserves the right to reject any proposal for being unresponsive or deemed irresponsible, rejectall proposals, or to accept the lowest responsive and responsible proposal/Bidder. Any proposal may be withdrawn prior to the above scheduled time for the opening of proposals or authorized postponement thereof. Any proposal received after the time and date specified shall not be considered. No proposal may be withdrawn after the scheduled closing time for receipt of Bids for at least one hundred fifty (150) days while final project approvals are acquired from the IFA SRF. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |