Similar Projects
UT Erfo Uinta NF 70014(1) Santaquin Canyon Road
Design
$1,000,000 to $4,000,000 est. value
Santaquin, UT

US-89; Improve Mobility/Safety in Orem City Limits
Post-Bid
$1,500,000 to $3,000,000 est. value
Orem, UT 84057

Pave the Existing Road to the Green Waste Pad
Post-Bid
Lindon, UT 84042

2019 Overlay Project
Results
Less than $294,507 est. value
Alpine, UT 84004

Center Street Widening
Results
Spanish Fork, UT 84660

Low Book Sales Dealership Expansion
New Construction, Alteration
Pending Verification
Lindon, UT 84042

2020 Roadway Project
Post-Bid
$2,200,000 to $2,400,000 est. value
Orem, UT 84057

Moyle Drive Roadway Improvement Project
Results
Alpine, UT

Slurry Seal
Post-Bid
Lehi, UT 84043

Pioneer Road Street Improvement Project
Results
Less than $608,004 est. value
Alpine, UT 84004

Crack Seal
Post-Bid
Lehi, UT 84043

Construction of the American Fork City 860 East Street Improvement Project
Results
Less than $276,255 est. value
American Fork, UT 84003

Chip Seal Material for Region Three
Term Contract
Post-Bid

2020 Street Rehabilitation Project
Results
Mapleton, UT 84664

Untreated Base Course
Term Contract
Post-Bid

Last Updated 08/06/2021 10:10 AM
Project Title

2021 Eagle Mountain Micro Surface Project

Physical Address View project details and contacts
City, State (County) Eagle Mountain, UT   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A Type III Micro Surface Treatment shall be placed on approximately 1,273,369SF, this will include 1,024,949SF on Pony Express Parkway in Saratoga and Eagle Mountain City. Eagle Mountain City and Saratoga City have an Interlocal Agreement on Pony Express Parkway requiring each party to be responsible for payment to their portion of roadway. Eagle Mountain City shall be primarily responsible for overseeing the project and collaborating with Saratoga City. This project is intended to take place in the month of July 2021. Contractor is responsible for installation of Type III Micro Surface Treatment, notifications, sweeping, preparing, traffic control, restriping and SWPPP.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents