Similar Projects
Gym Floor Replacement - Elm Park Community School / WPS
Alteration
Bidding
$160,000 est. value
Worcester, MA 01609

Furnishing and Installation of Vinyl Flooring
Post-Bid
Worcester, MA 01605

Carpet Replacement - Frances Perkins Branch Library/EAM
Post-Bid
Worcester, MA 01606

Remove and Replace Rolled Carpet, Cove Base and VCT with Carpet Tile, Cove Base and VCT
Results
Less than $45,000 est. value
Clinton, MA

Mid Rise Hallway Carpet Replacement
Results
$45,000 est. value
Clinton, MA 01510

Tile Removal for Degnan Building
Post-Bid
MA

High Rise Hallway Carpet Replacement Phase 2
Results
$45,000 est. value
Gardner, MA 01440

Carpet Replacement - Lunenburg Public Library
Post-Bid
$55,000 est. value
Lunenburg, MA 01462

Remove Approximately 7,238 Sq Ft of Floor Tiles
Results
$35,550 est. value
West Boylston, MA

Town Hall Flooring Replacement
Term Contract, Alteration
Post-Bid
Oxford, MA

Remove and Replace Existing Vinyl Stair Treads
Alteration
Results
$40,926 est. value
North Brookfield, MA 01535

Refinishing of Costello Gym (15,321 Square Feet)
Alteration
Post-Bid
$10,000 to $50,000 est. value
Shrewsbury, MA

On-Call Flooring Replacement Services
Alteration
Results
$24,900 est. value
Dudley, MA

Refinish Gymnasium Floor
Alteration
Post-Bid
$12,000 est. value
Fitchburg, MA

Install VCT Floor Tiles
Alteration
Results
Worcester, MA

Reported 05/26/2022 12:00 AM
Project Title

HVAC Vocational Shop Floor Repair / Resurface Project

Physical Address View project details and contacts
City, State (County) Upton, MA 01568   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The plan is to prepare the existing floor surface of the HVAC Program at Blackstone Valley Vocational Regional School District for the installation of a new resinous flooring system using a urethane mortar floor with epoxy topcoat, as well as a final urethane topcoat (flintshot).

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents