Similar Projects
Preventive Maintenance, Repair and Tank Cleaning of Asphalt Storage Tanks
Term Contract
Post-Bid

J035--RFI-Sources Sought Thermal Energy Storage Tank Repair
Post-Bid
Houston, TX 77030

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Ground Storage Tank Replacement
Post-Bid
TX

Water Plant No. 1 Ground Storage Tank Additions
Results
$800,000 est. value
Houston, TX 77070

Construction of Water Plant No. 4
Infrastructure
Post-Bid
$4,500,000 est. value
Houston, TX 77017

Friendship Park Elevated Water Storage Tank Rehabilitation
Results
Seabrook, TX 77586

Water Plant Expansion
Infrastructure
Post-Bid
Katy, TX 77450

Pine Village Water Plant No. 1 Hydropneumatic Tank Addition
Results
Houston, TX 77039

Water Plant No. 3 Recoating and Rehabilitation
Infrastructure
Post-Bid
Spring, TX 77373

Water Plant No. 1 Improvements
Results
TX

H M W Tank Order 2022
Infrastructure
Post-Bid
Spring, TX 77388

Water Plant Number 1 Recoating
Results
TX

2022 Water Plant Ground Storage Tank Improvements
Infrastructure
Post-Bid
$216,000 est. value
Houston, TX 77094

Last Updated 01/03/2022 09:07 AM
Project Title

Water Plant Coatings

Physical Address View project details and contacts
City, State (County) Cypress, TX 77429   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $160,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Mobilization to three (3) different sites in Cypress, Texas: a. Water Plant No. 1, 16105 Spring Cypress Road b. Water Plant No. 2, 13610 Telge Road c. Remote Well, 16455 Spring Cypress Road 2. Blast and Coat interior of one (1) 15,000 gallon hydropneumatic tank (10' dia. x 24' long) at Water Plant No. 1 3. Prep and Touch-Up exterior coatings of above ground piping at Water Plant No. 1 4. Repairs to interior walls and floor of two (2) 428,000 gallon grount storage tanks (55' dia. x 24' height) at Water Plant No. 2 5. Blast and Coat interior walls and floor of two (2) 428,000 gallon grount storage tanks (55' dia. x 24' height) at Water Plant No. 2 6. Blast and Coat exterior coatings of above ground piping at Remote Well.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents