Similar Projects
AC Repair Clarksburg, WV
Post-Bid
Clarksburg, WV

Chiller Rebuild - WV Visiting Nurse Facility
Post-Bid
Clarksburg, WV

Z--Eye Clinic HVAC Replacement Project Number 540-19-104
Results
$250,000 to $500,000 est. value
Bridgeport, WV 26330

HSC BAC Cooling Tower Refurbishment (2nd Half)
Results
Morgantown, WV 26506

Mini Split System Repair in Server Room - Martinsville, WV 26155
Post-Bid
New Martinsville, WV 26155

Touchdown Terrace Chiller Replacement
Results
Morgantown, WV 26506

Chiller and HVAC Full Service Comprehensive Contract - Joan C. Edwards School of Medicine
Post-Bid
Chapmanville, Huntington, WV

Heating, Ventilation and Air Conditioning Services (HVAC)
Term Contract
Results
Shepherdstown, WV 25443

Chiller Maintenance and Repair Services - Physical Plant Comprehensive Chiller Maintenance and Repair Services
Post-Bid
Huntington, WV 25755

Replacement of AHU's 5 and 6 at CAC
Results
Morgantown, WV 26506

Sorrell Maintenance Building HVAC System
Post-Bid
Huntington, WV 25755

HVAC Maintenance - Veterans Nursing Facility
Term Contract
Results
$30,239 est. value
Clarksburg, WV 26304

GCMAC - HVAC Equipment Maintenance Contract
Post-Bid
Moundsville, WV 26041

Vandalia HVAC Replacement Work
Results
Morgantown, WV 26506

HVAC and Mechanical Products
Term Contract
Post-Bid

Last Updated 06/08/2021 08:23 AM
Project Title

Building 5 DA Tank and Elevator Cooling Unit Repairs

Physical Address View project details and contacts
City, State (County) Charles Town, WV   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope Work is to Replace and install 2” Cap. (Current Copper 2” Cap is leaking). Cut the old 2” cap off and replace with a new solder on cap. Replacement and installation of Building 5 Chilled Water 2” Piping to Elevator Room. Piping revisions will require tying two (2) 2” Copper lines going through the Elevator Room back into the 6” headers below. Repair leaks to the five (5) DA Tank Pumps (1-1/2) lines to the 4” headers. All work will be done on the Eleventh (11th) Floor of Building 5.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents