Similar Projects
South Fork 24" Concrete Pipe Replacement/Lining - City Of Provo
Infrastructure
Conception
$800,000 est. value
Provo, UT 84604

Farmington Station Business Park
New Construction, Infrastructure
Bidding
$1,096,000 est. value
Farmington, UT 84025

Jordan Valley Water Treatment Plant Basins 3-6 Sedimentation Basins Upgrades
Infrastructure
Bidding
$17,000,000 to $22,000,000 est. value
Riverton, UT 84065

Sunbrook Golf Course Drainage
Post-Bid
Saint George, UT 84770

Kolob Terrace Road Retaining Walls
Infrastructure
Post-Bid
Saint George, UT

I-80; Culvert Rehabilitation
Results
$1,277,955 est. value

I-80; Culvert Rehabilitation
Results
$1,277,955 est. value

SR-24 Bull Creek Box Culvert Ext Other - Structures Project
Infrastructure
Bidding
$500,000 to $1,500,000 est. value
Torrey, UT 84775

Construction of the Upper Telluride Penstock Pipeline Replacement Phase 1
New Construction, Infrastructure
Post-Bid
Beaver, UT

Traverse Mountain Emergency Watershed Protection
Results
Lehi, UT 84043

SR-147 Culvert Replacement - Drainage
Infrastructure
Bidding
$500,000 to $1,500,000 est. value
Spanish Fork, UT 84660

Uintah Indian Irrigation Project
Infrastructure
Post-Bid
UT

Mcelmo Creek Bridge - 037012C
Results
$1,500,000 to $3,000,000 est. value
UT

Wasatch County Water Efficiency Project - Wasatch Canal Lining - Mill Road Bridge Replacement
Renovation, Infrastructure, Alteration
Post-Bid
Heber City, UT 84032

Local Strees Reconstruction 2021 #1
Results
Less than $2,383,000 est. value
Salt Lake City, UT

Reported 07/08/2022 12:00 AM
Project Title

West Drainage Project 2022

Physical Address View project details and contacts
City, State (County) Green River, UT   (Emery County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Major items of work: 1. Ditch Excavation 185 L.F. 2. Drop Inlet Box 5 Each 3. 36-Inch ADS Pipe 1520 L.F.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents