Similar Projects
Coastal Seafood
New Construction, Addition - 8,270 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Woolford, MD 21677

Seagirt Marine Terminal
Conception
$32,800,000 est. value
Baltimore, MD

Historic Fishing Facility And Waterman Docking Area
Renovation
Design
Royal Oak, MD 21662

Main Deck Replacement at ELMS Environmental Educational Center
Post-Bid
Less than $49,999 est. value
Lexington Park, MD 20653

Request for Information (RFI) Impact Pile Driving
Post-Bid
Patuxent River, MD

Replace an Existing Concrete Boat Ramp and Pier with New Flankwalls and Floating Dock at the Caroline County Boat Ramp
Results
Preston, MD 21655

Improvements to Waterman's Dock Dingy/Kayak/Canoe Dock and Dredging at West Chew Avenue
Results
Saint Michaels, MD 21624

Four Seasons at Kent Island Phase II
New Construction - 26,566 SF
Construction
Centreville, Chester, MD 21619

Living Shoreline, Erosion Control, Kayak Launch And Stone Bulkhead & Improvements
Renovation
Pending Verification
Arnold, MD

Bulkhead, Piers, Pilings, and Boat Lifts
Renovation
Pending Verification
Annapolis, MD 21403

Adaptive Boating Center
New Construction - 2,000 SF
Conception
$500,000 to $1,000,000 CJ est. value
Annapolis, MD 21043

Reef Construction/Sanctuary Restoration
Term Contract
Post-Bid
Annapolis, MD 21401

Mariner Point Park Canoe Launch
Results
Joppa, MD 21085

Bulkhead Replacement
Renovation
Pending Verification
Annapolis, MD

Removal of Derelict or Abandoned Boats in Choptank Marina
Post-Bid
Denton, MD

Last Updated 10/22/2020 11:31 AM
Project Title

Replacement at Inspiration Lake

Physical Address View project details and contacts
City, State (County) Gaithersburg, MD 20878   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City determined that replacement of the existing pier is not feasible due to the difficulty of access and the ability to bring in pile driving equipment as well as challenges obtaining approval to reinstall a structure on an earthen dam.The contractor will be fully responsible for the designing, furnishing, delivering and installing of a complete and fully functional new floating dock system, gangway, and appurtenances in accordance with the specifications and plans as specified herein as a basis. The contractor will be responsible for all erosion and sediment controls, minor tree trimming work as needed to have a clear walkable path. It is anticipated that no trees will be removed with this work. The contractor will be also responsible to install a sidewalk connection to the existing asphalt path, installation of riprap and underlayment, excavation and any debris removal. Site and erosion control plan is provided with the RFP (See Exhibit F).

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment, Floating Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents