Similar Projects
Lift Station and Waste Water Treatment Plant Site Improvements to Serve Oxford Place Phase 1
Alteration
Post-Bid
McKinney, TX

McKinney Ranch Pump Station Improvements Project
Renovation
Post-Bid
$13,500,000 est. value
McKinney, TX 75070

Mantua Point Phase 1 Sewer Lift Station and Force Main
Results
Frisco, TX

Maxwell Creek Lift Station Bypass Pump
Results
Allen, TX 75002

Stacy Road Pump Station 1 Rehabilitation
Renovation
Post-Bid
$3,500,000 est. value
Allen, TX 75013

Custer Road Pump Station Meter Vault Relocation
Results
$3,454,363 est. value
Prosper, TX 75078

Sunset Boulevard Lift Station
New Construction
Post-Bid
$845,000 est. value
Celina, TX 75009

5.0 MG Central Pump Station, 1.0-MG Awwa D110 Type III Ground Storage Reservoir and N.T.M.W.D. Meter Station
Results
$5,551,800 est. value
Parker, TX 75002

Seis Lagos Pump Station Improvements
Results
Less than $850,000 est. value
Lucas, TX 75002

City of Princeton Dogwood Pump Station Tank Mixing & Chloramine Boosting System
Results
Princeton, TX 75407

Inspiration - Lift Station No. 3
Results
Lucas, TX 75002

High Service Pump Station 3-1 Expansion
Results
$14,000,000 to $15,000,000 est. value
Wylie, TX 75098

Office Booster Pump Project
Results
Wylie, TX 75098

Reuse Pump Station Improvements
Results
$10,000,000 to $14,000,000 est. value
Frisco, TX

Pump Repairs and Pumping Station Services
Results
$65,000 est. value
Allen, TX

Last Updated 11/09/2021 04:33 PM
Project Title

Upper East Fork Interceptor System Sloan Creek Lift Station

Physical Address View project details and contacts
City, State (County) Fairview, TX   (Collin County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes construction of a new dry pit/wet well lift station in the Town of Fairview including the installation of four wastewater pumps and motors with adjustable speed drive, all associated piping, odor control system, construction of a new electrical control building with electrical equipment, an emergency backup generator, generator foundation, all associated electrical, instrumentation and control work, installation of six magnetic flow meters, 8-inch water line, 18-inch and 24-inch gravity sewer, yard piping and site improvments for the Sloan Creek Lift Station.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents