Similar Projects
Water System Interconnect Upgrades
Bidding
Pompano Beach, FL

BCJC Jail Water Meter Reconfiguration
Sub-Bidding
Fort Lauderdale, FL 33301

Water Service Line Replacement
Post-Bid
Less than $600,000 est. value
Coral Springs, FL

Parkside Water Main Replacement Project
Post-Bid
Hollywood, FL

Cured in Place Pipe Rehabilitation, Annual Contract
Term Contract
Results
Pompano Beach, FL 33060

Directional Boring Services
Results
Sunrise, FL

South Middle River Forcemain Crossing Design Build
Term Contract
Construction
Less than $45,000 est. value
Fort Lauderdale, FL 33301

Fire Hydrants and Accessories
Term Contract
Post-Bid
Fort Lauderdale, FL 33301

Water Meter, Register, and Transmitter Change-Out
Results
Plantation, FL 33317

Provide an On-Site Calibration and Verification of 26 Abb Flow Meters
Term Contract
Post-Bid
Less than $10,995 est. value
Hollywood, FL

Water and Sewer Emergency Repair Services
Term Contract
Results
Miramar, FL 33025

Construction Services for Pier Street West
Post-Bid
Pompano Beach, FL 33060

Regional Master Meter Improvements – Bid Package 2
Results
$220,000 to $1,100,000 est. value
Fort Lauderdale, FL 33301

Force Main Upsize from PS DS-36 to PS D-35 P12413
Results
Less than $1,000,000 est. value
Fort Lauderdale, FL 33301

Unidirectional Flushing Program
Term Contract
Results
Less than $100,000 est. value
FL

Last Updated 12/16/2020 07:22 PM
Project Title

Design-Build Coral Shores Small Water Mains Improvements P12463

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL 33301   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $30,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be accomplished under this contract includes, but is not limited to; construction of new water lines via pipe bursting and horizontal directional drilling (HDD) methods, relocation of existing water meters and service lines (as indicated on the conceptual plans), including all other aspects of the project to fulfill the intent of the Project as described in the Design Criteria Package and all supporting documents

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents