Similar Projects
Reservoir Rehabilitation
Bidding
Tucson, AZ

Construction of Sun City Festival Ranch Infrastructure Sewer for Parcel E2
Bidding
Buckeye, AZ

Sanitary Sewer Collection System Rehabilitation Pipes 2017-2018
Post-Bid
Tempe, AZ 85281

Water Supply And Distribution System Improvements
Post-Bid
Whetstone, AZ

Lower Greasewood Water System Improvements
Results
$6,000,000 to $7,000,000 est. value
Fort Defiance, AZ

The Grid Mixed Use Project Site Improvements CMAR
Renovation
Results
$2,500,000 to $4,500,000 est. value
Mesa, AZ 85201

Coconino Estates Phase II Improvements
Bidding
Flagstaff, AZ

Kyrene Middle School Underground Piping Replacement
Term Contract
Post-Bid
$3,200,000 est. value
Tempe, AZ 85284

Water Meters
Results
Glendale, AZ 85301

Construction Manager at Risk Project at Force Main System Wide Retrofit
Bidding
Gilbert, AZ

VA Tucson Upgrade Water Infrastructure System
Post-Bid
$2,000,000 to $5,000,000 est. value
Tucson, AZ

Job Order Contracting Services For Sewer Main And Manholes
Results
Chandler, AZ

2020-21 Manhole Rehabilitation
Bidding
Safford, AZ

Water Loading Station Maintenance
Post-Bid
Fort Defiance, AZ 86504

Airport Drive Water Line
Results
$142,734 to $261,969 est. value
Queen Creek, AZ 85142

Last Updated 01/25/2021 10:47 AM
Project Title

West Flag Improvements - David and Hutcheso

Physical Address View project details and contacts
City, State (County) Flagstaff, AZ   (Coconino County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Utility and roadway improvement project on David Drive from William Road to Hutcheson Drive and on Hutcheson Drive from Fine Avenue to David Drive. The improvements generally consist of replacing approximately 2,900 LF of water main, 40 water services, 1,100 LF of sewer main, 40 sewer services, 5 manholes, new storm drain inlets, 9,600 SY of asphalt structural section, select edge improvements, and other associated work.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents