Similar Projects
Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Morrie's Hyundai
New Construction, Renovation, Addition - 194,745 SF
Design
Minneapolis, MN 55426

Seven Points Uptown
New Construction, Infrastructure, Renovation - 172,000 SF
Design
$150,000,000 CJ est. value
Minneapolis, MN 55408

2021 Seal Coat/Fog Seal Project
Infrastructure
Post-Bid
Corcoran, MN

Realignment of CSAH 92
Infrastructure
Post-Bid
Medina, MN

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

Pedestrian Crossing and Bikeway Safety Improvements - REBID
Renovation
Results
Bloomington, Eden Prairie, Minneapolis, MN

Quarter Lake West Apartments Phase I
New Construction
Construction
$224,000,000 est. value
Minneapolis, MN 55416

Brookdale Gas and Deli
Renovation, Build-Out - 3,689 SF
Construction
Minneapolis, MN 55444

Bauer's Minnoco Auto Repair Expansion
Addition
Pending Verification
Minnetonka, MN 55345

Cornelia View Apartments
Infrastructure, Renovation
Pending Verification
$33,000,000 CJ est. value
Minneapolis, MN 55435

Crystal Community Center Parking Lot and Bassett Creek Dog Park
Infrastructure
Design
$2,079,215 CJ est. value
Crystal, MN 55422

Tesla Target Charging Stations
Addition
Post-Bid
Bloomington, MN 55431

Bituminous Mill and Overlay
Results
Medina, MN

Bhatti GI Surgery Center
Demolition, New Construction, Infrastructure - 40,032 SF
Construction
$15,000,000 CJ est. value
Minneapolis, MN 55435

Last Updated 11/10/2022 04:17 PM
Project Title

ABRA Auto Body & Glass / Eden Prairie

Physical Address View project details and contacts
City, State (County) Eden Prairie, MN 55347   (Hennepin County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected June 2019
Bids Due View project details and contacts
Estimated Value $1,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

13045, 13075 and 13105 Pioneer Trl. As of August 14, 2018 this project is pending approval by the Eden Prairie City Council. Information regarding the selection of an architect and general contractor has not been released. While a firm construction timeline has not yet been established, construction is expected to begin in the second quarter 2019. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

18,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents