Similar Projects
Preventive and Predictive Maintenance Services for Chillers
Term Contract, Alteration
Bidding
GA

Replace (3) Cooling Towers Central Plant
Alteration
Bidding
Morrow, GA

Water Coolers and Bottle Filling Stations at Juliette Gordon Lowe Building, Savannah, GA
Post-Bid
Savannah, GA

Hot Water Heater Replacements
Post-Bid
Athens, GA

Classroom South Replace Boiler and Hot Water Pumps
Results
Less than $172,000 est. value
Atlanta, GA 30303

CMAR - Central Steam Plant Boiler Replacement
Results
Less than $3,800,000 est. value
Athens, GA 30602

Blast Media Recovery System Upgrade
Post-Bid
Warner Robins, GA

Addison and Baker Elementary Schools Freezer and Cooler Replacement
Results
Marietta, GA 30068

Annual Contract for Major Mechanical Repairs and Services
Term Contract
Post-Bid
Atlanta, GA 30303

All Mechanical, Electrical and Plumbing Work
Results
Lakeland, GA 31635

Advance Metering Infrastructure and Smart Meters
Post-Bid
Atlanta, GA 30303

Provision of Heat Tracing and Insulation of Piping on an Annual Contract
Term Contract
Results
Lawrenceville, GA 30046

Cryo Ln2 Freezer
Post-Bid
Lawrenceville, GA 30045

J Building Boilers
Term Contract
Results
Albany, GA 31707

Beck Valves Parts and Ancillary Services
Term Contract
Post-Bid
Atlanta, GA

Last Updated 07/01/2021 09:24 AM
Project Title

Replace Central Plant Boilers

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30310   (Fulton County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $746,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide design-build services for the design, sizing, and installation of replacement boilers and associated piping, pumps, and hot water piping system in the AMSC central plant. The scope of work at the Central Plant will include removal of the existing steam boilers, steam-to-hot water converter, pumps and steam and steam condensate piping. The replacement boilers and hot water piping system will temporarily provide heating water for the existing heating water loop serving multiple buildings until a future project will provide dedicated boilers at each building, or combination of buildings, and modifications made to the central loop piping allowing the decommissioning of most of the hot water loop. The buildings currently served by the central heating water plant, and therefore the replacement boilers, are: Academic – Building 500; Central Plant; Library/Administration Building - Building 600; Student Services & Success Building - Building 650; Physical Education – Building 700.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents