Similar Projects
Massey Chapel Road Townhomes
New Construction, Infrastructure
Conception
$9,000,000 CJ est. value
Durham, NC 27713

Mockingbird Lane and Sherron Road Townhomes
New Construction, Infrastructure
Conception
$47,000,000 CJ est. value
Durham, NC 27701

Core Durham
New Construction, Infrastructure - 120,000 SF
Design
$23,000,000 CJ est. value
Durham, NC 27701

Northgate Mall Redevelopment
Demolition, Renovation, Infrastructure - 1,000,000 SF
Design
$38,000,000 CJ est. value
Durham, NC 27701

Maryland Avenue Bridge Removal
Demolition, Infrastructure
Bidding
$476,269 CJ est. value
Durham, NC 27705

Maryland Avenue Bridge Removal
Demolition, Infrastructure
Bidding
$476,269 CJ est. value
Durham, NC 27705

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

North Carolina Central University Collaborative Learning and Research Center
New Construction, Infrastructure - 4,900 SF
Post-Bid
$3,000,000 CJ est. value
Durham, NC 27707

TWWTP Water Line Extension
Results
$118,556 est. value
Durham, NC 27713

Triangle Wastewater Treatment Plant Emergency and Scheduled Treatment Plant Repairs
Results
Durham, NC

Northern Durham Convenience Site Construction
Construction
Less than $2,470,000 est. value
Rougemont, NC 27701

4800 Duraleigh Road Apartments
New Construction, Infrastructure
Construction
$90,000,000 CJ est. value
Raleigh, NC 27612

New Elementary School F Project
New Construction, Infrastructure - 108,000 SF
Pending Verification
$49,326,165 CJ est. value
Durham, NC 27713

5000 Louisburg Road Apartments
New Construction, Infrastructure
Pending Verification
$98,100,000 CJ est. value
Raleigh, NC 27616

Long Meadow Pool Replacement - CH430 - City of Durham
Infrastructure
Conception
$5,500,000 CJ est. value
Durham, NC 27701

Last Updated 11/04/2022 11:41 AM
Project Title

Homeland + Aiken Stream Stabilization at the North Durham Water Reclamation Facility - Rebid

Physical Address View project details and contacts
City, State (County) Durham, NC 27707   (Durham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,790,345 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of 430 linear feet of sanitary sewer and restoration of 1,500 linear feet of an UT to Third Fork Creek near Homeland Avenue in Durham, NC and installation of approximately 932 linear feet of sanitary sewer and restoration of 1,700 linear feet of Goose Creek near Aiken Avenue in Durham, NC. The foregoing description shall not be construed as a complete description of all work required. Each Bidder must be licensed under Chapter 87 of the North Carolina General Statutes. Bidders must conform with the provisions of the North Carolina Contractor's Licensing Act of 1925, as amended. All Bids must include a non-collusion affidavit. The City of Durham requires the Project to be substantially completed within 330 consecutive calendar days, and completed within 365 calendar days from date of Notice to Proceed. The City may allow a time period of up to 180 days between the date of contract execution by the City and the Notice to Proceed to accommodate material procurement delays if the Contractor can sufficiently demonstrate through letters from at least three material vendors that the extended lead time is warranted. Request for time extensions due to over-booking of Contractor or Subcontractor workforce(s) will not be considered. No Bid shall be considered or accepted unless at the time of its filing the same shall be accompanied by a deposit of cash or a certified or cashier's check drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation (FDIC), in an amount equal to five percent (5%) of the amount of the Bid. The check shall be made payable to the City of Durham. Said deposit shall guarantee that the Contract will be entered into by the successful Bidder if the award is made. Such deposit of cash or certified or cashier's check may be held by the City until the successful Bidder has executed and delivered the Contract Documents, including performance and payment bond, to the City of Durham and returned or kept in accordance with North Carolina General Statute 143-129. Refer to other Bidding requirements described in Document 00 21 15. In lieu of the cash deposit or certified or cashier's check mentioned above, the Bidder may file a Bid bond in the same amount executed by a corporate surety authorized to execute such bonds in North Carolina and conditioned as provided by North Carolina General Statute 143-129 and in the form attached to the Bidding Documents (see Appendix F) or on file with the Engineer. Bid bond forms enclosed as part of the Bidding Documents must be properly executed at the time Bids are submitted before Bid will be considered. Properly executed Power of Attorney of the corporate surety's agent shall accompany such bond and be attached to the page provided therefore in the Bidding Documents. Bids shall be submitted under a condition of irrevocability, except as required by law, for a period of ninety (90) days after Bid opening. The City of Durham reserves the right to accept or reject any or all Bids, to waive any and all informalities, and to disregard all nonconforming or conditional Bids or counter Bids, and to accepts the Bid that will be in the best interest of the City of Durham.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents