Similar Projects
Orange Technical College - Winter Park Campus Replacement
Conception
$32,500,000 est. value
Winter Park, FL 32789

Winter Park High School
Renovation
Conception
$9,900,000 est. value
Winter Park, FL 32792

Site 90-K8-N-7 K8 School
New Construction - 164,000 SF
Design
Less than $49,000,000 est. value
Apopka, FL 32712

Glenridge Middle School Capital Renewal
Design
$4,176,000 to $5,700,000 est. value
Orlando, FL 32814

Jones High School Capital Renewal Project
Post-Bid
Orlando, FL 32805

Boone High School Building 800 Capital Renewal Project
Post-Bid
Orlando, FL 32806

Construction Manager at Risk Services for Site 132-M-W-4 Middle School and Site 89-E-W-4 Elementary School Projects
New Construction
Results
Less than $57,000,000 est. value
Orlando, FL 34787

Construction Management at Risk Services for Avalon and Meadowbrook Middle Schools Capital Renewal Project
Results
Less than $4,500,000 est. value
Orlando, FL 32828

Colonial 9th Grade Center Capital Renewal Project
Construction
$3,500,000 est. value
Orlando, FL 32807

Exceptional Student Education Campus Consolidation Projects
Renovation - 149,981 SF
Construction
Less than $36,000,000 est. value
Orlando, FL 32818

Lake Highland Prep School Upper Campus
New Construction, Demolition - 71,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Orlando, FL 32803

Site 65-M-W-4 New Multi Story Middle School Project
New Construction - 185,000 SF
Design
Less than $36,000,000 est. value
Orlando, FL 32809

OCPS Site 90 K-8
Post-Bid
Apopka, FL

Disaster Recovery Services
Results

Meadow Woods Middle School Comprehensive Project
New Construction, Renovation - 168,785 SF
Construction
Less than $16,000,000 est. value
Orlando, FL

Reported 05/07/2021 12:00 AM
Project Title

OCPS Windermere High School Portable Removal Project

Physical Address View project details and contacts
City, State (County) Windermere, FL 34786   (Orange County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of removal of thirty-six classroom portables and 2 restroom portables including disconnection/abandonment of portable electric, plumbing, fire alarm, intercom, security, and low voltage wiring; removal/relocation of signage, ramps and railings, sidewalks and concrete pads, fire access road, fencing, door hardware, and classroom technology; investigation and repairs of existing underground drainage system, restoration of practice field, and repair/restoration of the existing play field irrigation system. LDB goal is 10%, VBE goal is 3%

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents