Similar Projects
Woodbridge Lane, Ridgewood Acres and Woodbridge Lane Pump Station Reconstruction Project
Renovation
Bidding
$1,000,000 to $2,499,999 est. value
Thomaston, CT 06787

Improvements to Cove River Wastewater Pumping Station
Post-Bid
West Haven, CT

Sandy Hook Pump Station Upgrade
Post-Bid
Newtown, CT

Wastewater Pump Station Rehabilitation Project
Results
Middlebury, CT

Removal and Disposal of Grease in Pump Station Wet Wells
Results
Stamford, CT 06901

Salisbury and Sharon Regional Transfer Station
New Construction - 6,400 SF
Construction
$3,072,000 est. value
Lakeville, CT 06039

Shepaug Reservoir Gate House Inlet Screen Cleaning
Post-Bid
Waterbury, CT

Sailors Lane Pump Station Replace and Elevate Generator
Results
Milford, CT

Batterson Park Pump Station Upgrade
Renovation
Post-Bid
$1,700,000 est. value
Farmington, CT

Horsebarn Hill Pump Station
Results
Less than $550,000 est. value
Storrs, CT

Water Treatment Facility Plant Water Pump Station Improvements
Results
Less than $483,200 est. value
West Hartford, CT

Cider Mill Pump Station Upgrade
Results
Glastonbury, CT

Back-up Generator Installation & Pump Control Relocation at Pine Trail, Barbara Avenue and North Main Street Pump Stations
Results
East Hampton, CT 06424

CSO Reduction And SCADA Uprades To The Rose Alley Pumping Station And WPCF
Results
Norwich, CT 06360

Design-Build Standby Generator for Clay Hill Road Pump Station
Results
Stamford, CT

Last Updated 11/27/2018 06:19 AM
Project Title

Condensate Pump Station at the Ferrara School

Physical Address View project details and contacts
City, State (County) East Haven, CT 06513   (New Haven County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $16,952
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Replacement of Condensate Pump Station at Ferrara School, 22 Maynard Road, East Haven, CT 06513. Scope of work to include: 1. Coordinate with customer when work can be conducted. 2. Conduct Lock Out/Tag Out of boiler heating system. This lock out encompasses locking out power feed to duplex condensate pump station. 3. Disconnect piping and electrical from condensate pump station. 4. Remove pump station and install new replacement pump station with new replacement control panel. 5. Reconnect piping and electrical feed to pump station. 6. Reenergize system and conduct leak check. 7. Insulate all newly installed piping. 8. Restart system and check operation. 9. Dispose of all demoed equipment and material.
Details
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents