Similar Projects
El Cajon Branch Library
New Construction, Infrastructure
Conception
$30,300,000 est. value
El Cajon, CA 92020

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Roadway Rehab to Mitigate Highway Settlement, Construct Aux Lane
Infrastructure
Design
$44,537,000 est. value
San Diego, CA 92124

Storm Water Diversion at the South Bay Water Reclamation Plant
Demolition, New Construction, Infrastructure
Bidding
$2,940,000 CJ est. value
San Diego, CA 92154

Parking Lot Seal And Stripe Services
Infrastructure
Post-Bid
$65,000 est. value
San Diego, CA 92117

Street Preventive Maintenance
Alteration
Post-Bid
$420,000 est. value
Coronado, CA

Slurry Seal Services
Infrastructure
Results
Vista, CA 92081

ADP Airside Improvements
New Construction, Renovation, Infrastructure, Alteration
Results
$270,000,000 est. value
San Diego, CA

Oceanside Fire Station #1
Demolition, New Construction, Infrastructure
Construction
$13,579,000 CJ est. value
Oceanside, CA 92054

The Trails At Carmel Mountain Ranch
New Construction, Infrastructure
Pending Verification
$450,000,000 CJ est. value
San Diego, CA 92101

SRM Hillcrest
New Construction, Infrastructure - 374,899 SF
Pending Verification
$100,000,000 CJ est. value
San Diego, CA 92103

Construct Rumble Strips on Both Shoulders, Rehabilitate Bike Path, and Install Fiber Optic Cable/closed Circuit Television (Cctv)
Infrastructure
Design
$7,535,000 CJ est. value
San Diego, CA 92101

Minor B - Sb - Install Mgs
Infrastructure
Post-Bid
CA

Pershing Drive Bikeway Project
Infrastructure
Results
$12,980,675 est. value
San Diego, CA 92101

Helix 9 Flow Control Facility
New Construction, Infrastructure
Design
$6,000,000 to $8,000,000 est. value
San Diego, CA

Last Updated 09/26/2022 12:35 AM
Project Title

Citywide Crack Sealing Program 2022

Physical Address View project details and contacts
City, State (County) Santee, CA 92071   (San Diego County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $145,750 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 4, 2022 , this project has not yet been awarded. The project is expected to be awarded on May 11, 2022. CONTRACT WORK DESCRIPTION: Work to be done includes the furnishing of all labor, materials and equipment necessary for placing crack seal, traffic control and all related and necessary work as defined in the contract documents Bid Bond/Cashiers Check: 10%, Performance Bond: 100%, Material & Labor Bond: 100% Contractor License: California Classification A, C-12 or C-32 (required at time of bid submission). Engineers Estimate: $233,000.00 Contract Working Days: 50 Working Days Any questions relating to this project should be directed to Toby Espinola at (619) 258- 4100 ext. 174, or via email at tobyespinola@CityofSanteeCA.gov.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents