Similar Projects
CDBG Water System Improvements
Bidding
Adamsville, TN

Town Center Water Main
Renovation
Bidding
White House, TN 37188

Hydrant Assist/Relay Valve
Post-Bid
Chattanooga, TN 37402

Standard Valves
Term Contract
Post-Bid
Chattanooga, TN 37402

TVA System Operations Center Off-Site Water Line Extension
Results
Chattanooga, TN 37402

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Highway 70/56 Water Line Relocation
Bidding
$225,000 est. value
Cookeville, TN 38501

36” Dezurik Knife Gate Valves
Post-Bid
Chattanooga, TN 37400

Purchase of AMR Style Water Meters
Results
Signal Mountain, TN 37377

Water Line Extension Improvements for 2020 CDBG Water System Improvements
Bidding
Maynardville, TN

CDBG 2019 Wastewater Collection Improvements
Post-Bid
Rockwood, TN

2020 Red Bank Sewer Rehabilitation
Results
Red Bank, TN

Midfield Apron Expansion Water and Sewer Improvements
Bidding
$550,000 est. value
Gallatin, TN 37066

Moccasin Bend WWTP Equalization Basin And Blower Replacement Improvements
Post-Bid
Chattanooga, TN 37405

Snow Hill Road Force Main Repair Phase 1
Results
Less than $77,850 est. value
Chattanooga, TN

Last Updated 12/10/2019 07:57 AM
Project Title

CKL Electrical and Water Line Rehabilitation

Physical Address View project details and contacts
City, State (County) Chattanooga, TN 37415   (Hamilton County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This work involves the replacement of electrical systems and raw water piping at the Chickamauga Lock. The electrical systems rehabilitation will include replacing the motor control center in the operations building, and replacing the upstream and downstream control consoles. The electrical system rehabilitation will also include rerouted wires using cable tray (to run along the outside edge of the of the lock walls) and conduit. The embedded conduit and wiring being replaced will be abandoned in place. The raw water rehabilitation will include replacing all the existing piping, fittings, gate solenoids, valves, hangers, and sprinkler heads. The existing pump and pump platform will be reused and incorporated into the new plumbing system. All replaced systems will require commissioning, as-built drawings, and operation and maintenance documentation.

Details

Division 26 - Electrical.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents