Similar Projects
Clearwater Multimodal Transit Center
New Construction - 75,000 SF
Conception
$34,000,000 est. value
Clearwater, FL 33757

Port St. Lucie Intermodal Facility
New Construction
Conception
FL

FL Keys Marathon Airport Non-Aeronautical Use Building (EOC)
- 23,000 SF
Design
Marathon, FL

Ground Transportation Center Project
New Construction
Design
Sarasota, FL 34243

Terminal, Hangar, and Apron Expansion at Defuniak Springs Airport
Addition - 17,900 SF
Bidding
Defuniak Springs, FL 32433

Federal Inspection Station Renovation
Renovation, Demolition - 60,000 SF
Bidding
Sanford, FL

Airport Operations Center and Airfield Electrical Vault
New Construction - 8,600 SF
Sub-Bidding
$4,300,000 est. value
Stuart, FL 34996

Airside A Passenger Boarding Bridge Replacement At Tampa International Airport
Post-Bid
Less than $20,497,996 est. value
Tampa, FL 33607

Terminal Expansion and Renovation - Apron Reconstruction/Expansion Project
Renovation, Addition
Post-Bid
Melbourne, FL 32901

Design/Build Firms for the Buildout of STC Airline and Tenant Spaces Program
Build-Out
Results
Orlando, FL 32827

Construction of Satellite Concourse "C" at VPS
Results
Eglin AFB, FL 32542

Virgin Voyages - Terminal V
New Construction
Construction
$150,000,000 est. value
Miami, FL

MSC PortMiami
New Construction
Construction
$300,000,000 est. value
Miami, FL

Lilium Vertiports
New Construction
Pending Verification
Orlando, FL

Ferry Expansion
New Construction
Pending Verification
Redwood City, San Francisco, CA - Mission Bay, FL 94158

Last Updated 03/04/2022 04:10 PM
Project Title

Greyhound Bus Terminal - Permanent Location

Physical Address View project details and contacts
City, State (County) Daytona Beach, FL 32114   (Volusia County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method
Project Status Construction Commenced May 2021, Construction Complete as of February 2022
Bids Due View project details and contacts
Estimated Value $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is subject to Federal and FDOT grant requirements and the participation of disadvantaged businesses is encouraged.

Details

Airline/Passenger Terminal, Approximately 12,000 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents