Similar Projects
Portsmouth High School Partial Roof Replacement
Post-Bid
Portsmouth, RI 02871

Kennedy Manor Roof Replacement
Post-Bid
Pawtucket, RI 02860

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roof Replacement at Kickemuit Village
Post-Bid
Warren, RI 02885

Minor Roof Repairs at Various City-Owned Buildings
Term Contract
Results
Warwick, RI

Building 3
Post-Bid
West Greenwich, RI 02817

EPDM Roof - Building 113
Results
$500,000 to $1,000,000 est. value
Newport, RI 02841

The Boys Girls Club of Providence South Side Facility
Post-Bid
Providence, RI

Roof Replacement James P. Adams Library - Rhode Island College
Results
Providence, RI 02908

Roofing MACC
Post-Bid

Safety Complex Membrane Roofing Replacement/BUR Repairs
Results
North Kingstown, RI 02852

Roofing Repair and Maintenance
Post-Bid

CCRI 6th Floor Roof Replacement, Knight Campus
Results
Warwick, RI 02886

Fire Station 4 Roof Repair
Post-Bid
Pawtucket, RI

Last Updated 10/28/2021 03:56 PM
Project Title

Narragansett Laboratory Building Roof Repair/Replacement

Physical Address View project details and contacts
City, State (County) Narragansett, RI 02882   (Washington County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, material, tools, equipment, and supervision necessary to complete the installation of approximately 11,507 square feet (sf) of white 60-mil thick TPO membrane fully adhered & Mechanically fastened overlay roofing system with a minimum solar reflect of .90 (CCRC ASTMC1371), including flashings and tapered insulation as specified herein and as indicated in accordance with the manufacturer’s most current specifications and details to ensure to deliver a roofing systems meeting the requirements in the contract documents supporting the best practices as recommended by the manufacture, NRCA, UL, and ASTM. A. The contract shall provide an engineered taper plan for the installation of the new roofing system. B. The contractor shall raise flashing as necessary to ensure proper elevation of new roof system. C. The contractor shall sump all roof drains to provide proper drainage to minimize any standing water. D. The roofing contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their work. E. The contractor shall be required to relocate, raise and/or move any obstacle preventing work from meeting all requirements within the contract documents. This shall include connections including but not limited to electrical, plumbing, refrigeration, structural and mechanical. F. The contractor shall ensure/verify roofing surface is completely clean and dry before proceeding with installation. G. The contractor shall install a new roofing system under and around all roof piping, extrusions, rooftop exhaust vents and or any other items located on or penetrating the roof. H. The contractor shall install new perimeter blocking as required to accommodate new insulation heights and to ensure proper drainage. I. The contractor shall confirm all supplied information prior to bid, and Inform COR of any conflicts that will affect their cost proposal. J. Contractor shall tapper roof insulation with 1/8” per foot with a 1/2'” minimum roof board to ensure proper drainage to all roof drains and Scuppers with no standing water. K. Any contractor who intends to submit a bid using a roofing system other than the approved manufacturer must submit for pre-qualification in writing ten (10) calendar days prior to the bid date. Any contractor who fails to submit all information as requested will be subject to rejection.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents