Similar Projects
Redevelopment of Existing Wells
Bidding
Niskayuna, NY

Clarence Research Park WRRF Outfall Improvements
Bidding
Buffalo, Clarence, NY 14031

Three (3) Wastewater Influent Pumps
Post-Bid
Endicott, NY 13760

Settled WasteWater Pump and Motor 2 Rehabilitation at Bird Island Treatment Facility
Post-Bid
Buffalo, NY 14202

Replace Jockey Pump Controller, Schenectady, NY
Results
Less than $25,000 est. value
Niskayuna, NY 12309

Dover Ridge Water Supply – Water System Improvements
Results
Less than $400,000 est. value
Poughquag, NY 12570

Sump Pump
Bidding
NY

Furnish Hidrostahl Submersible Pump at Thomas Creek Pump Station
Post-Bid
Fairport, NY 14614

Pump-Recessed Impeller Sludge Recirculation and Pump-Replacement Pump-Hayward Gordon
Term Contract
Results
Pomona, NY 10970

Installation of Well Pump Well 2
Post-Bid
Beacon, NY 12508

Generator and Fire Pump Services
Term Contract
Results
NY

Sewage Pumps
Post-Bid
Cortlandt Manor, NY 10567

Sanitary Lift Pump Replacements
Results
Lockport, NY 14094

Repair WEMCO Pump
Post-Bid
White Plains, NY 10601

2020 Pump Station and Wet Well Cleaning and Disposal
Results
Poughkeepsie, NY 12601

Reported 09/11/2020 12:00 AM
Project Title

Screw Pump Replacement at Middletown WWTF

Physical Address View project details and contacts
City, State (County) Middletown, NY 10940   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of furnishing and installing of 3 primary screw pump V FD Panels, 2 secondary screw pump VFD Panels, 2 secondary submersible pump VFDs and V FD Panels along with conduits and cables, instrumentation control system and panel, and temporary power to screw pump equipment at the Middletown Wastewater Treatment Facility at 159 Dolson Avenue, Middletown, New York, 10940. The Bidders shall note the following items: The secondary submersible pump are installed and will not be replaced, The replacement primary and secondary screw pumps have been pre-procured by the City and will be furnished by Evoqua Water Technologies and installed by Boyce Excavating Company. Evoqua Water Technologies will also provide the five VFDs required for the screw pumps which will be shipped to the VFD panel manufactured selected by the Electrical Contractor for incorporation into the new VFD panels. The City's current Instrumentation System Integrator is Aaron Associates of CT, Inc.; who is under contract to upgrade the instrumentation control system at the City's W WTF and therefore must be used for this work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents