Similar Projects
Beehive Homes of Maple Grove Phase 2 Alteration
New Construction, Infrastructure - 11,881 SF
Post-Bid
Maple Grove, MN 55311

Arthur's Senior Care
New Construction
Design
Roseville, MN 55113

Canterbury Crossing Senior Housing
New Construction - 25,850 SF
Design
$500,000 to $1,000,000 CJ est. value
Shakopee, MN 55379

7500 York Cooperative Window And Door Replacement
Renovation
Post-Bid
Edina, MN 55435

Snelling Yards Senior Living Facility
New Construction
Construction
Minneapolis, MN 55406

VA Home Montevideo, MN - Subcontractor Pre-Qualification Process
New Construction
Post-Bid
Montevideo, MN

Amber Fields Development
New Construction, Infrastructure - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Rosemount, MN

VA Home Preston, MN - Subcontractor Pre-Qualification Process
New Construction
Post-Bid
Preston, MN 55965

Gateway Housing
New Construction, Infrastructure - 75,899 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Burnsville, MN

ThePointe Minnetonka
New Construction
Sub-Bidding
Minnetonka, MN 55305

Veterans Home
New Construction
Post-Bid
Preston, MN

Cherrywood Pointe Senior Living Center
New Construction
Design
Bloomington, Minneapolis, MN 55437

MN State Veteran's Home
New Construction, Renovation
Post-Bid
$44,000,000 est. value
Montevideo, MN 56265

Rochester Library & Mixed Use Development
New Construction - 458,000 SF
Conception
$10,000,000 CJ est. value
Rochester, MN 55904

Last Updated 09/09/2021 05:23 PM
Project Title

Chanhassen Independent Living

Physical Address View project details and contacts
City, State (County) Chanhassen, MN 55317   (Carver County)
Category(s) Residential
Sub-Category(s) Assisted Living Facility
Contracting Method
Project Status Construction Commenced June 2021, Construction Completion Expected October 2022, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $30,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Assisted Living Facility, 3 Stories Above Grade, 166,024 SF New Construction, 110 Unit(s), 3.68 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents