Similar Projects
MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Bidding
Less than $3,293,600 est. value
Salt Lake City, UT 84115

Mt. Vista Parkway Sewer Reroute 2020
Bidding
Provo, UT 84606

2019 Gravity Sewer Improvements
Post-Bid
Saratoga Springs, UT

1080 East 1320 South Project
Post-Bid
Provo, UT 84601

2018 Sewer Relining Project
Results
Saint George, UT

ERDA West Region Interceptor Sewer Line
Results
UT

Canyon View and Ocampo Utility Improvements Project
Bidding
Less than $475,000 est. value
Payson, UT 84651

Freedom Boulevard Improvements - Mill Race 42-In Storm Drain and Aerial to Underground Project
Post-Bid
Provo, UT 84601

Canyon Road Sewer Extension 5000 North to 5300 North
Results
Less than $325,000 est. value
Providence, UT

Road Construction and Utility Improvements
Bidding
Brigham City, Corinne, UT 84307

Lehi City Lower School House Springs
Post-Bid
Lehi, UT 84043

UDOT and CIPP Sewer Repair Projects
Results
Provo, UT

Caldwell Sewer Line Replacement
Bidding
Tooele, UT 84074

500 West Sewer Improvements Project
Post-Bid
Vernal, UT

Battle Creek Springs Rehabilitation
Results
Less than $2,180,410 est. value
Pleasant Grove, UT

Reported 02/05/2019 12:00 AM
Project Title

B269 Replace Water, Sanitary Sewer Lines, and Roof Drains in Ogden, UT

Physical Address View project details and contacts
City, State (County) Ogden, UT   (Weber County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Contractor is to provide all management, supervision, labor, tools, materials, equipment and transportation necessary to replace water lines, sewer lines, and storm drain pipes at building 269, Ogden, Utah. Tasks include and are not limited to the following: -Removal and Replacement of plumbing supply lines (This includes the primarily surface mounted steel piping in the open shop areas, and concealed piping in the restrooms) - Replace sinks, toilets, and urinals with new (add motion sensor sinks and flush valves). Install new stops and seals. -Replace existing shower enclosures with new tile enclosures and new showerheads. -Replace old drinking fountains with new units that include water bottle filling stations with filter. Retain two drinking fountains with bottle filling stations that are already installed. -Replace above ground sewer lines and vents. -Remove and replace bathroom linoleum flooring with new tile.
Details
Division 03 - Concrete, Precast Concrete.
Division 09 - Finishes, Flooring.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents