Similar Projects
Last Updated | 07/28/2022 06:32 PM |
Project Title | Miranda 18" Wastewater Relief Line |
Physical Address | View project details and contacts |
City, State (County) | El Paso, TX 79901 (El Paso County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $4,032,527 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Works to be provided for this project shall be for furnishing all labor, materials, transportation, and services for the construction and installation as follows: The project is for the installation of approximately 5,600 linear feet of 18-inch wastewater collector in northwest El Paso. The new 18-inch will be installed using open cut and bore methods. Under this project Contractor is responsible for the following: 1. Insurance, Bonds, and Move-In Related Expenses, Not to Exceed 5% of Total Bid. 2. Video and photos of the construction route and project area. 3. Furnish and install approximately 3,859 linear feet of 18-inch PVC SDR-35 pipeline and approximately 1,070 linear feet of 18-inch PVC C-900 sewer relief line. All work necessary to furnish and install the new 18-inch relief line to include traffic control, permitting, stormwater pollution prevention plan, bypass pumping and/or diversion of flows, cleaning and cleaning and testing of sewer line, return site to original condition. 4. Furnish and install Trench Safety for the project. 5. Furnish and install approximately 668 linear feet of 30-inch steel casing by bore method to include TxDOT right-of-way. 6. Furnish and install 16 Type A 4-foot diameter manholes and approximately 77 additional vertical feet of manhole depth; three (3) manholes with tie-in connections to existing sanitary sewer system, one (1) drop connection manhole. 7. Remove and dispose of approximately 110 linear feet of abandoned 36-inch waterline as needed to accommodate the new sewer line. 8. TxDOT Crossing Coordination with TxDOT for crossing of Mesa Road and Interstate Highway I-10. 9. Bypass pumping and/or diversion of flows as may be required to complete tie-in connections to the existing system. 10. Relocate approximately 60 linear feet of 6-inch waterline to accommodate bore pit and new sewer line installation. 11. Remove, dispose and replace HMAC approximately 5,400 square yards of existing asphalt pavement inclusive of subgrade preparations. 12. Furnish and install approximately 100 cubic yards of two sack sand cement backfill. 13. Remove, dispose and replace approximately 1,020 square feet of concrete sidewalk and approximately 300 linear feet of concrete curb and gutter and 70 square yards of pedestrian surfaces. 14. Abandonment of existing inverted sewer siphon to be pump filled with grout and abandoned in placed. 15. Maintain "As-Built" record drawings and provide Construction Progress Photos. 16. Provide project dewatering as required for construction. 17. Provide Site Security and dust control. 18. Provide project safety in accordance with all latest Occupational Safety and Health Administration (O.S.H.A.) requirements as the work dictates. The project description, as shown above, is only a general overview of this project. The Contractor shall refer to the project plans and specifications for further information. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |