Similar Projects
Caughfield Phase Twelve and Thirteen Paving, Drainage, Water and Wastewater Improvements
Bidding
TX

Estates At Northgate Phase 1 Section 3
Bidding
Austin, TX

College Park Drive Phase II
Post-Bid
Round Rock, TX 78664

Bell Boulevard at Cypress Creek Road Intersection Improvements
Post-Bid
Cedar Park, TX 78613

Southern Region Disaster Recovery Support BPA
Results

Job Order Contract for Paving and Asphalt Services
Term Contract
Results
Less than $500,000 est. value
Round Rock, TX

Estates at Northgate Phase 1, Section 3, "Paving, Drainage, and Water Improvements"
Bidding
TX

Berry Creek Highlands - Phase I
Post-Bid
Georgetown, TX 78746

Bicycle Lane Construction Phase 1A
Results
Less than $300,000 est. value
Cedar Park, TX 78613

Parmer Ranch Phase 1
Post-Bid
TX

County Road 101 Construction
Results
$13,092,842 est. value
Georgetown, TX 78626

Caughfield Phase Ten Paving, Drainage, Water and Wastewater Improvements
Post-Bid
TX

Sunrise Road and Luther Peterson Place Intersection Improvements
Results
Less than $350,000 est. value
Round Rock, TX 78664

Balcones Asphalt Paving
Post-Bid
$35,000 to $45,000 est. value

Overlay
Results
Less than $1,983,228 est. value
TX

Last Updated 07/29/2020 12:19 PM
Project Title

Bell Boulevard Realignment Project

Physical Address View project details and contacts
City, State (County) Cedar Park, TX 78613   (Williamson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Old Highway 183 is a two-lane roadway parallel to Bell Boulevard (US 183), running generally north and south. Bell Boulevard would be realigned and relocated to the Old Highway 183 alignment and reconstructed to a four-lane divided roadway that would include a raised median with turn lanes at intersections and driveways. The project would also include lighting, pedestrian and bicycle paths, and landscaping. The project is 0.8 mile in length and would include grading,base, asphalt pavement, culverts, signing, and pavement markings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents